{"id":106049,"date":"2026-04-22T16:31:58","date_gmt":"2026-04-22T16:31:58","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=106049"},"modified":"2026-04-22T16:32:47","modified_gmt":"2026-04-22T16:32:47","slug":"adecuaciones-en-la-subestacion-turen-i-benefician-a-mas-de-18-mil-portuguesenos","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=106049","title":{"rendered":"Adecuaciones en la subestaci\u00f3n Tur\u00e9n I benefician a m\u00e1s de 18 mil portuguese\u00f1os"},"content":{"rendered":"\n<p><strong>Estado Portuguesa.-<\/strong> Con el prop\u00f3sito de optimizar el suministro de la energ\u00eda a los habitantes de los municipios Tur\u00e9n y Esteller en el estado Portuguesa, la clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), realiz\u00f3 adecuaciones y mejoras en las instalaciones de la subestaci\u00f3n 115kV Tur\u00e9n I.<\/p>\n\n\n\n<p>Las labores contempladas en el Plan Anual de Mantenimiento de la estatal el\u00e9ctrica, benefician a m\u00e1s de 18 mil usuarios atendidos por los circuitos La Colonia, El Guamal, Landini, Paica y Merecure.<\/p>\n\n\n\n<p>Los sectores favorecidos con estas adecuaciones son Aquilino Colmenarez, La Colonia, Camino 2, 3, 4, Micro Este, Chingal\u00ed, El Palmar, El Aj\u00ed, El Ajicito, La Cueva del Sapo, El Pedral, Carretero, Acequioncito, La Sure\u00f1a, Alfonzo Granic, Tapapallo, Los Rieras, Negrones, Corralito, Uveral, Mantecal Matapalo, Banco Morales, Negrones, Curva de Negrones, Barrancones, La Carretera 3, Ca\u00f1averal, El Colombiano, Cisneros Soler y Ca\u00f1o Chispa.<\/p>\n\n\n\n<p>Paralelamente, se ejecut\u00f3 despeje de vegetaci\u00f3n en los corredores de la l\u00ednea Tur\u00e9n I \u2013 Play\u00f3n 115 kV y correcci\u00f3n de un punto caliente en la salida del circuito Merecure.<\/p>\n\n\n\n<p>Los trabajadores del sector el\u00e9ctrico se mantienen activos en el cumplimiento de las estrategias orientadas a robustecer la confiabilidad del sistema, para garantizar el bienestar de la poblaci\u00f3n venezolana.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Portuguesa.- Con el prop\u00f3sito de optimizar el suministro de la energ\u00eda a los habitantes de los municipios Tur\u00e9n y<\/p>\n","protected":false},"author":24,"featured_media":106051,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2704,2725],"class_list":["post-106049","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mantenimiento","tag-portuguesa"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/106049","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=106049"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/106049\/revisions"}],"predecessor-version":[{"id":106052,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/106049\/revisions\/106052"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/106051"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=106049"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=106049"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=106049"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}