{"id":106153,"date":"2026-04-25T14:36:21","date_gmt":"2026-04-25T14:36:21","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=106153"},"modified":"2026-04-25T14:36:58","modified_gmt":"2026-04-25T14:36:58","slug":"mantenimiento-en-subestacion-guaira-favorece-a-mas-de-97-mil-habitantes","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=106153","title":{"rendered":"Mantenimiento en subestaci\u00f3n Guaira favorece a m\u00e1s de 97 mil habitantes"},"content":{"rendered":"\n<p><strong>Estado La Guaira.- <\/strong>Con labores de mantenimiento integral en la subestaci\u00f3n Guaira y en la L\u00ednea 30 Kv, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) optimiza el suministro el\u00e9ctrico ofrecido a 97 mil 795 habitantes del estado La Guaira.<\/p>\n\n\n\n<p>Durante los trabajos ejecutados, el personal especializado realiz\u00f3 labores de limpieza, rehabilitaci\u00f3n y sustituci\u00f3n de componentes electromec\u00e1nicos en la instalaci\u00f3n el\u00e9ctrica. De igual manera, se sustituyeron aisladores en una de las torres de la l\u00ednea 30 KV, lo que permiti\u00f3 mejorar significativamente su capacidad operativa y fortalecer la red de distribuci\u00f3n en la entidad guairense.<\/p>\n\n\n\n<p>Simult\u00e1neamente, se realizaron labores correctivas en el s\u00f3tano del circuito Guaira donde se sustituy\u00f3 140 metros de conductor de media tensi\u00f3n, para fortalecer la interconexi\u00f3n de dos circuitos y la distribuci\u00f3n de energ\u00eda a las comunidades de la parroquia La Guaira.<\/p>\n\n\n\n<p>De esta manera, el Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE) a trav\u00e9s de CORPOELEC, impulsa acciones eficientes que tributan a la estabilizaci\u00f3n del Sistema El\u00e9ctrico Nacional (SEN).<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado La Guaira.- Con labores de mantenimiento integral en la subestaci\u00f3n Guaira y en la L\u00ednea 30 Kv, la Corporaci\u00f3n<\/p>\n","protected":false},"author":24,"featured_media":106156,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2743,2704,11],"class_list":["post-106153","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-la-guaira","tag-mantenimiento","tag-mppee"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/106153","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=106153"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/106153\/revisions"}],"predecessor-version":[{"id":106157,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/106153\/revisions\/106157"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/106156"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=106153"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=106153"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=106153"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}