{"id":106183,"date":"2026-04-27T12:21:23","date_gmt":"2026-04-27T12:21:23","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=106183"},"modified":"2026-04-27T12:23:45","modified_gmt":"2026-04-27T12:23:45","slug":"corpoelec-fortalece-transmision-de-energia-en-beneficio-de-mas-de-90-mil-mirandinos","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=106183","title":{"rendered":"CORPOELEC fortalece transmisi\u00f3n de energ\u00eda en beneficio de m\u00e1s de 90 mil mirandinos"},"content":{"rendered":"\n<p><strong>Estado Miranda.- <\/strong>Con el prop\u00f3sito de fortalecer la transmisi\u00f3n del servicio el\u00e9ctrico, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) efectu\u00f3 labores\u00a0 preventivas en las subestaciones Diego Lozada y Santa Teresa III 400\/230\/115\/ 34,5 kV en beneficio de 92 mil 900 usuarios de los municipios Crist\u00f3bal Rojas, Independencia, Rafael Urdaneta, Paz Castillo, Tom\u00e1s Lander y Sim\u00f3n Bol\u00edvar del estado Miranda.<\/p>\n\n\n\n<p>Las maniobras se centraron en la&nbsp; revisi\u00f3n,&nbsp;pruebas&nbsp;a esquemas de protecciones de las l\u00edneas&nbsp; Santa Teresa&nbsp; y Diego Lozada 2, sustituci\u00f3n de componentes el\u00e9ctricos a los seccionadores e interruptores, lubricaci\u00f3n de partes m\u00f3viles y ajuste de torniller\u00eda, con el objetivo de mejorar las condiciones operativas de los equipos de potencia.<\/p>\n\n\n\n<p>El Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE) a trav\u00e9s de CORPOELEC, avanza en la planificaci\u00f3n de planes preventivos a fin de garantizar la operatividad de las instalaciones del Sistema El\u00e9ctrico Nacional (SEN) en el estado Miranda.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- Con el prop\u00f3sito de fortalecer la transmisi\u00f3n del servicio el\u00e9ctrico, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) efectu\u00f3 labores\u00a0 preventivas<\/p>\n","protected":false},"author":24,"featured_media":106184,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2704,2709,11],"class_list":["post-106183","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mantenimiento","tag-miranda","tag-mppee"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/106183","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=106183"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/106183\/revisions"}],"predecessor-version":[{"id":106185,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/106183\/revisions\/106185"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/106184"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=106183"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=106183"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=106183"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}