{"id":106393,"date":"2026-05-05T15:29:38","date_gmt":"2026-05-05T15:29:38","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=106393"},"modified":"2026-05-05T17:11:46","modified_gmt":"2026-05-05T17:11:46","slug":"mas-de-430-mil-guairenos-beneficiados-con-mantenimiento-en-la-subestacion-tacoa","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=106393","title":{"rendered":"M\u00e1s de 430 mil guaire\u00f1os beneficiados con mantenimiento en la subestaci\u00f3n Tacoa"},"content":{"rendered":"\n<p><strong>Estado La Guaira.- <\/strong>Con el objetivo de garantizar la optimizaci\u00f3n del suministro el\u00e9ctrico en el estado La Guaira, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) realiz\u00f3 mantenimiento preventivo y correctivo en la subestaci\u00f3n Tacoa 230 kV, para beneficiar a m\u00e1s de 430 mil habitantes del Litoral Central.<\/p>\n\n\n\n<p>Las labores incluyeron revisi\u00f3n, limpieza y optimizaci\u00f3n de componentes y equipos electromec\u00e1nicos, as\u00ed como mantenimiento y pruebas funcionales a los seccionadores asociados a la l\u00ednea Tacoa-Boyac\u00e1-Los Magallanes.<\/p>\n\n\n\n<p>Asimismo, se realizaron trabajos de metalmec\u00e1nica para eliminar condiciones de riesgo, con el prop\u00f3sito de prolongar la vida \u00fatil de la infraestructura y garantizar un \u00f3ptimo funcionamiento de los equipos de transmisi\u00f3n y distribuci\u00f3n de energ\u00eda en favor de los habitantes de las parroquias del municipio Vargas.<\/p>\n\n\n\n<p>Con estas acciones, CORPOELEC reafirma su compromiso con la poblaci\u00f3n guairense y garantiza la continuidad del servicio el\u00e9ctrico en las comunidades de la entidad.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado La Guaira.- Con el objetivo de garantizar la optimizaci\u00f3n del suministro el\u00e9ctrico en el estado La Guaira, la Corporaci\u00f3n<\/p>\n","protected":false},"author":24,"featured_media":106409,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2743,2704,11],"class_list":["post-106393","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-la-guaira","tag-mantenimiento","tag-mppee"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/106393","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=106393"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/106393\/revisions"}],"predecessor-version":[{"id":106398,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/106393\/revisions\/106398"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/106409"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=106393"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=106393"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=106393"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}