{"id":106656,"date":"2026-05-14T16:31:39","date_gmt":"2026-05-14T16:31:39","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=106656"},"modified":"2026-05-14T16:32:37","modified_gmt":"2026-05-14T16:32:37","slug":"fortalecen-operatividad-de-red-electrica-en-beneficio-de-mas-de-21-mil-guairenos","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=106656","title":{"rendered":"Fortalecen operatividad de red el\u00e9ctrica en beneficio de m\u00e1s de 21 mil guaire\u00f1os"},"content":{"rendered":"\n<p><strong>Estado La Guaira.-<\/strong> La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), ejecuta trabajos para fortalecer la red el\u00e9ctrica de media tensi\u00f3n en los circuitos de Picure, ubicada en el estado La Guaira en beneficio de m\u00e1s de 21 mil guaire\u00f1os de las parroquias Carayaca y Catia La Mar.<\/p>\n\n\n\n<p>Las labores efectuadas contemplaron la sustituci\u00f3n de cadena de aisladores, rehabilitaci\u00f3n de l\u00edneas de media tensi\u00f3n, cambios de cuchillas y&nbsp; de componentes el\u00e9ctricos, para mejorar el servicio el\u00e9ctrico en las comunidades de las localidades de Esperanza, Arrecifes, El Pozo, Pueblo de Carayaca, Picure, Puerto Carayaca, Las Salinas, Taguao, Tarma, Tirima, Chichiriviche (La Costa), urbanizaci\u00f3n Oricao y Villa Croacia.<\/p>\n\n\n\n<p>Asimismo, se instal\u00f3 un transformador de potencia de 25 kVA en el pueblo de Zapateral, para garantizar el servicio el\u00e9ctrico a 30 familias agr\u00edcola de la parroquia Carayaca.<\/p>\n\n\n\n<p>Con estas acciones, CORPOELEC fortalece y optimiza el sistema de distribuci\u00f3n para el buen vivir de la poblaci\u00f3n en zonas residenciales e impulsa el desarrollo de actividades productivas, tur\u00edsticas y comerciales en el estado La Guaira.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado La Guaira.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), ejecuta trabajos para fortalecer la red el\u00e9ctrica de media tensi\u00f3n en los<\/p>\n","protected":false},"author":24,"featured_media":106659,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2743,2704,11],"class_list":["post-106656","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-la-guaira","tag-mantenimiento","tag-mppee"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/106656","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=106656"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/106656\/revisions"}],"predecessor-version":[{"id":106660,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/106656\/revisions\/106660"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/106659"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=106656"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=106656"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=106656"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}