{"id":106737,"date":"2026-05-18T14:47:24","date_gmt":"2026-05-18T14:47:24","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=106737"},"modified":"2026-05-18T15:01:48","modified_gmt":"2026-05-18T15:01:48","slug":"mejoras-en-el-servicio-electrico-benefician-a-mas-de-8-mil-familias-neoespartanas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=106737","title":{"rendered":"Mejoras en el servicio el\u00e9ctrico benefician a m\u00e1s de 8 mil familias neoespartanas"},"content":{"rendered":"\n<p><strong>Estado Nueva Esparta.-<\/strong> La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC avanza en los planes de electrificaci\u00f3n de la regi\u00f3n insular, beneficiando a m\u00e1s de 8 mil familias, esfuerzo que se realiza mediante un trabajo mancomunado con las comunidades, tras consultas populares que han permitido identificar necesidades espec\u00edficas en materia de energ\u00eda el\u00e9ctrica .<\/p>\n\n\n\n<p>Las acciones incluyen la colocaci\u00f3n de m\u00e1s de 20 postes y 15 transformadores, as\u00ed como el reemplazo de 2.700 metros de l\u00edneas de baja y media tensi\u00f3n, adem\u00e1s, se extendi\u00f3 la red el\u00e9ctrica con 500 metros adicionales y sus elementos correspondientes. Este proceso t\u00e9cnico garantiza una mejora sustancial en la calidad del servicio el\u00e9ctrico.<\/p>\n\n\n\n<p>El equipo de CORPOELEC brinda acompa\u00f1amiento t\u00e9cnico y asesoramiento constante durante las etapas del proyecto iniciadas desde el 2025, asegurando que cada comunidad reciba el apoyo necesario, iniciativa que optimiza el suministro energ\u00e9tico.<\/p>\n\n\n\n<p>Con estas mejoras, CORPOELEC reafirma su compromiso con el bienestar de las comunidades insulares.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Nueva Esparta.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC avanza en los planes de electrificaci\u00f3n de la regi\u00f3n insular, beneficiando a<\/p>\n","protected":false},"author":24,"featured_media":106754,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2704,11,2727],"class_list":["post-106737","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mantenimiento","tag-mppee","tag-nueva-esparta"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/106737","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=106737"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/106737\/revisions"}],"predecessor-version":[{"id":106748,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/106737\/revisions\/106748"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/106754"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=106737"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=106737"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=106737"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}