{"id":106801,"date":"2026-05-20T13:47:27","date_gmt":"2026-05-20T13:47:27","guid":{"rendered":"https:\/\/mppee.gob.ve\/?p=106801"},"modified":"2026-05-20T13:48:25","modified_gmt":"2026-05-20T13:48:25","slug":"optimizan-redes-electricas-en-aragua-con-labores-de-control-de-vegetacion","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=106801","title":{"rendered":"Optimizan redes el\u00e9ctricas en Aragua con labores de control de vegetaci\u00f3n"},"content":{"rendered":"\n<p><strong>Estado Aragua.- <\/strong>Desde este mi\u00e9rcoles 20 hasta el pr\u00f3ximo martes 26 de mayo, la clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), efectuar\u00e1 labores a trav\u00e9s del Plan de Control de Vegetaci\u00f3n, en aras de optimizar las redes el\u00e9ctricas en el estado Aragua.<\/p>\n\n\n\n<p>Los trabajos preventivos se ejecutar\u00e1n en los municipios Francisco Linares Alc\u00e1ntara, Girardot, Zamora, Libertador, Mario Brice\u00f1o Iragorry, Lamas y Sucre<\/p>\n\n\n\n<p>Las jornadas se desarrollar\u00e1n en un horario comprendido desde las 12:00 del mediod\u00eda hasta las 4:00 de la tarde en los circuitos Santa Rita, Lourdes, Pavona, Los Aviadores, Inos, El Paseo, Corinsa, San Francisco, Villa de Cura, La Ovallera y Messer respectivamente.<\/p>\n\n\n\n<p>CORPOELEC avanza hacia el fortalecimiento del Sistema El\u00e9ctrico Nacional (SEN) y la mejora continua para los usuarios de las poblaciones arag\u00fce\u00f1as, como parte del Plan de Control y Vegetaci\u00f3n, impulsado por el Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE).<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Aragua.- Desde este mi\u00e9rcoles 20 hasta el pr\u00f3ximo martes 26 de mayo, la clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica<\/p>\n","protected":false},"author":24,"featured_media":106804,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2708,3281,2691,11],"class_list":["post-106801","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-aragua","tag-control-de-vegetacion-2","tag-corpoelec","tag-mppee"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/106801","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=106801"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/106801\/revisions"}],"predecessor-version":[{"id":106805,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/106801\/revisions\/106805"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/106804"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=106801"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=106801"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=106801"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}