{"id":87526,"date":"2022-07-11T19:32:00","date_gmt":"2022-07-11T19:32:00","guid":{"rendered":"http:\/\/10.200.87.50\/mppee\/?p=87526"},"modified":"2022-07-13T19:42:14","modified_gmt":"2022-07-13T19:42:14","slug":"corpoelec-continua-trabajos-de-instalacion-de-luminarias-led-en-vias-expresas-de-la-guaira","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=87526","title":{"rendered":"Corpoelec contin\u00faa trabajos de instalaci\u00f3n de luminarias LED en v\u00edas expresas de La Guaira"},"content":{"rendered":"<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-87529 alignleft\" src=\"http:\/\/10.200.87.50\/mppee\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-3-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-3-300x200.jpg 300w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-3-1024x682.jpg 1024w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-3-768x512.jpg 768w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-3.jpg 1280w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>Contin\u00faan los trabajos de rehabilitaci\u00f3n e instalaci\u00f3n de luminarias en la carretera Tanaguarenas \u2013Naiguat\u00e1 \u2013Los Caracas en el estado La Guaira, como parte del Plan de Iluminaci\u00f3n de V\u00edas Expresas que adelanta el Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica, a trav\u00e9s de Corpoelec.<\/p>\n<p>As\u00ed lo inform\u00f3 el vicepresidente Sectorial de Obras P\u00fablicas y Servicios, G\/J N\u00e9stor Reverol, en su cuenta de Instagram, donde precis\u00f3 que los trabajos de iluminaci\u00f3n se desarrollan en tres fases para cubrir toda la carretera v\u00eda costera.<\/p>\n<p><strong>\u201cNuestros trabajadores de la Estatal el\u00e9ctrica conjuntamente con la Gobernaci\u00f3n de la entidad culminaron las dos primeras etapas que incluyeron 16 kil\u00f3metros de alumbrado p\u00fablico y la colocaci\u00f3n de cinco transformadores 25 kVA; adem\u00e1s de tres kil\u00f3metros de conductor triple\u201d<\/strong>, refiri\u00f3 el General en Jefe.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-87530 alignleft\" src=\"http:\/\/10.200.87.50\/mppee\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-4-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-4-300x200.jpg 300w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-4-1024x682.jpg 1024w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-4-768x512.jpg 768w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-4.jpg 1280w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>Agreg\u00f3 que actualmente se est\u00e1 ejecutando la tercera fase que comprende desde Anare hasta Los Caracas con siete kil\u00f3metros de sistema de alumbrado p\u00fablico, donde se instalar\u00e1n 160 postes y 150 luminarias LED solares de 300 vatios.<\/p>\n<p>El Plan Integral de Iluminaci\u00f3n de V\u00edas Expresas inici\u00f3 a finales del a\u00f1o 2020, a trav\u00e9s del cual se ha logrado brindar seguridad integral a quienes transitan por las diferentes carreteras de la geograf\u00eda venezolana.<br \/>\n<b><br \/>\n<em>Rehabilitan 100% Circuito Fivirex II de la subestaci\u00f3n Barcelona<\/em><\/b><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-87537 alignleft\" src=\"http:\/\/10.200.87.50\/mppee\/wp-content\/uploads\/2022\/07\/Rehabilitan-100-Circuito-Fivirex-II-de-la-subestaci\u00f3n-Barcelona-4-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Rehabilitan-100-Circuito-Fivirex-II-de-la-subestaci\u00f3n-Barcelona-4-300x225.jpg 300w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Rehabilitan-100-Circuito-Fivirex-II-de-la-subestaci\u00f3n-Barcelona-4-1024x768.jpg 1024w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Rehabilitan-100-Circuito-Fivirex-II-de-la-subestaci\u00f3n-Barcelona-4-768x576.jpg 768w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Rehabilitan-100-Circuito-Fivirex-II-de-la-subestaci\u00f3n-Barcelona-4.jpg 1040w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>En 100% fue rehabilitada la carga el Circuito Fivirex II de la subestaci\u00f3n Barcelona, en el estado Anzo\u00e1tegui, luego de una serie de trabajos de reingenier\u00eda y adecuaciones para optimizar la distribuci\u00f3n de energ\u00eda el\u00e9ctrica en los sectores residencial y comercial en la capital de la entidad oriental.<\/p>\n<p>El tambi\u00e9n titular del despacho de Energ\u00eda El\u00e9ctrica, se\u00f1al\u00f3 que los trabajos desarrollados contemplaron la construcci\u00f3n de un importante tramo de tendido entre la subestaci\u00f3n y el primer bloque de cruce de l\u00edneas, que permite mejorar la operatividad del sistema y, a su vez, ofrecer mejores condiciones de maniobrabilidad en casos de mantenimiento preventivo o soporte t\u00e9cnico<\/p>\n<p><strong>Prensa Mppee<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-87531 size-full\" src=\"http:\/\/10.200.87.50\/mppee\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-5.jpg\" alt=\"\" width=\"1280\" height=\"853\" srcset=\"https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-5.jpg 1280w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-5-300x200.jpg 300w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-5-1024x682.jpg 1024w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-5-768x512.jpg 768w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-87533 size-full\" src=\"http:\/\/10.200.87.50\/mppee\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-7.jpg\" alt=\"\" width=\"1280\" height=\"853\" srcset=\"https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-7.jpg 1280w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-7-300x200.jpg 300w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-7-1024x682.jpg 1024w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-7-768x512.jpg 768w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-87532 size-full\" src=\"http:\/\/10.200.87.50\/mppee\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-6.jpg\" alt=\"\" width=\"1280\" height=\"853\" srcset=\"https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-6.jpg 1280w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-6-300x200.jpg 300w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-6-1024x682.jpg 1024w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Corpoelec-contin\u00faa-trabajos-de-instalaci\u00f3n-de-luminarias-LED-en-v\u00edas-expresas-de-La-Guaira-6-768x512.jpg 768w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-87534 size-full\" src=\"http:\/\/10.200.87.50\/mppee\/wp-content\/uploads\/2022\/07\/Rehabilitan-100-Circuito-Fivirex-II-de-la-subestaci\u00f3n-Barcelona-1.jpg\" alt=\"\" width=\"810\" height=\"1080\" srcset=\"https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Rehabilitan-100-Circuito-Fivirex-II-de-la-subestaci\u00f3n-Barcelona-1.jpg 810w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Rehabilitan-100-Circuito-Fivirex-II-de-la-subestaci\u00f3n-Barcelona-1-225x300.jpg 225w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Rehabilitan-100-Circuito-Fivirex-II-de-la-subestaci\u00f3n-Barcelona-1-768x1024.jpg 768w\" sizes=\"auto, (max-width: 810px) 100vw, 810px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-87535 size-full\" src=\"http:\/\/10.200.87.50\/mppee\/wp-content\/uploads\/2022\/07\/Rehabilitan-100-Circuito-Fivirex-II-de-la-subestaci\u00f3n-Barcelona-2.jpg\" alt=\"\" width=\"1080\" height=\"810\" srcset=\"https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Rehabilitan-100-Circuito-Fivirex-II-de-la-subestaci\u00f3n-Barcelona-2.jpg 1080w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Rehabilitan-100-Circuito-Fivirex-II-de-la-subestaci\u00f3n-Barcelona-2-300x225.jpg 300w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Rehabilitan-100-Circuito-Fivirex-II-de-la-subestaci\u00f3n-Barcelona-2-1024x768.jpg 1024w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Rehabilitan-100-Circuito-Fivirex-II-de-la-subestaci\u00f3n-Barcelona-2-768x576.jpg 768w\" sizes=\"auto, (max-width: 1080px) 100vw, 1080px\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-87536 size-full\" src=\"http:\/\/10.200.87.50\/mppee\/wp-content\/uploads\/2022\/07\/Rehabilitan-100-Circuito-Fivirex-II-de-la-subestaci\u00f3n-Barcelona-3.jpg\" alt=\"\" width=\"810\" height=\"1080\" srcset=\"https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Rehabilitan-100-Circuito-Fivirex-II-de-la-subestaci\u00f3n-Barcelona-3.jpg 810w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Rehabilitan-100-Circuito-Fivirex-II-de-la-subestaci\u00f3n-Barcelona-3-225x300.jpg 225w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Rehabilitan-100-Circuito-Fivirex-II-de-la-subestaci\u00f3n-Barcelona-3-768x1024.jpg 768w\" sizes=\"auto, (max-width: 810px) 100vw, 810px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Contin\u00faan los trabajos de rehabilitaci\u00f3n e instalaci\u00f3n de luminarias en la carretera Tanaguarenas \u2013Naiguat\u00e1 \u2013Los Caracas en el estado La<\/p>\n","protected":false},"author":12,"featured_media":87527,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[],"class_list":["post-87526","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/87526","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=87526"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/87526\/revisions"}],"predecessor-version":[{"id":87538,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/87526\/revisions\/87538"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/87527"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=87526"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=87526"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=87526"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}