{"id":87539,"date":"2022-07-12T19:51:00","date_gmt":"2022-07-12T19:51:00","guid":{"rendered":"http:\/\/10.200.87.50\/mppee\/?p=87539"},"modified":"2022-07-13T20:02:01","modified_gmt":"2022-07-13T20:02:01","slug":"distribuidas-mas-de-6-mil-800-luminarias-y-211-transformadores-en-tercera-entrega-al-1x10-del-buen-gobierno","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=87539","title":{"rendered":"Distribuidas m\u00e1s de 6 mil 800 luminarias y 211 transformadores  en tercera entrega al 1&#215;10 del Buen Gobierno"},"content":{"rendered":"<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-87543 alignleft\" src=\"http:\/\/10.200.87.50\/mppee\/wp-content\/uploads\/2022\/07\/Distribuidas-m\u00e1s-de-6-mil-800-luminarias-y-211-transformadores-en-tercera-entrega-al-1x10-del-Buen-Gobierno-4-300x228.jpg\" alt=\"\" width=\"300\" height=\"228\" srcset=\"https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Distribuidas-m\u00e1s-de-6-mil-800-luminarias-y-211-transformadores-en-tercera-entrega-al-1x10-del-Buen-Gobierno-4-300x228.jpg 300w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Distribuidas-m\u00e1s-de-6-mil-800-luminarias-y-211-transformadores-en-tercera-entrega-al-1x10-del-Buen-Gobierno-4-1024x777.jpg 1024w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Distribuidas-m\u00e1s-de-6-mil-800-luminarias-y-211-transformadores-en-tercera-entrega-al-1x10-del-Buen-Gobierno-4-768x583.jpg 768w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Distribuidas-m\u00e1s-de-6-mil-800-luminarias-y-211-transformadores-en-tercera-entrega-al-1x10-del-Buen-Gobierno-4.jpg 1080w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>Como parte de la tercera entrega de materiales e insumos el\u00e9ctricos para responder a las solicitudes de los ciudadanos realizadas a trav\u00e9s del Sistema 1&#215;10 del Buen Gobierno, este martes fueron desplegados 211 transformadores de diferentes potencias, 6 mil 837 luminarias de tecnolog\u00eda LED, adem\u00e1s de otros equipamientos.<\/p>\n<p>La actividad se llev\u00f3 a cabo en los espacios del Centro de Servicio Chacao, ubicado en el estado Miranda, y cont\u00f3 con la asistencia del vicepresidente Sectorial de Obras P\u00fablicas y Servicios, G\/J N\u00e9stor Reverol, quien destac\u00f3 que <strong>\u201cestamos entregando un lote de materiales, equipos y 6 mil 837 luminarias, as\u00ed como tambi\u00e9n 211 transformadores, que se despliegan a lo largo y ancho del territorio nacional para resolver 373 casos, en beneficio de m\u00e1s de 30 mil 500 familias\u201d.<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-87542 alignright\" src=\"http:\/\/10.200.87.50\/mppee\/wp-content\/uploads\/2022\/07\/Distribuidas-m\u00e1s-de-6-mil-800-luminarias-y-211-transformadores-en-tercera-entrega-al-1x10-del-Buen-Gobierno-3-300x191.jpg\" alt=\"\" width=\"300\" height=\"191\" srcset=\"https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Distribuidas-m\u00e1s-de-6-mil-800-luminarias-y-211-transformadores-en-tercera-entrega-al-1x10-del-Buen-Gobierno-3-300x191.jpg 300w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Distribuidas-m\u00e1s-de-6-mil-800-luminarias-y-211-transformadores-en-tercera-entrega-al-1x10-del-Buen-Gobierno-3-1024x652.jpg 1024w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Distribuidas-m\u00e1s-de-6-mil-800-luminarias-y-211-transformadores-en-tercera-entrega-al-1x10-del-Buen-Gobierno-3-768x489.jpg 768w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Distribuidas-m\u00e1s-de-6-mil-800-luminarias-y-211-transformadores-en-tercera-entrega-al-1x10-del-Buen-Gobierno-3.jpg 1080w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>Agreg\u00f3 el General en Jefe, que todos los martes se establece la Tercera L\u00ednea Estrat\u00e9gica de la Acci\u00f3n de Gobierno, como es el derecho al ambiente, a la ciudad y a los servicios p\u00fablicos, por medio del equipamiento y recursos destinados a garantizar la estabilidad y confiabilidad del Sistema El\u00e9ctrico Nacional.<\/p>\n<p>Por su parte, Douglas Malav\u00e9, transportista de la flota pesada, adscrita al \u00e1rea de Bienes y Servicios de Corpoelec &#8211; Anzo\u00e1tegui, expres\u00f3 su orgullo por <strong>\u201caportar un granito de arena en llevar los transformadores a las comunidades que lo necesitan\u201d.<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-87541 alignleft\" src=\"http:\/\/10.200.87.50\/mppee\/wp-content\/uploads\/2022\/07\/Distribuidas-m\u00e1s-de-6-mil-800-luminarias-y-211-transformadores-en-tercera-entrega-al-1x10-del-Buen-Gobierno-2-300x214.jpg\" alt=\"\" width=\"300\" height=\"214\" srcset=\"https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Distribuidas-m\u00e1s-de-6-mil-800-luminarias-y-211-transformadores-en-tercera-entrega-al-1x10-del-Buen-Gobierno-2-300x214.jpg 300w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Distribuidas-m\u00e1s-de-6-mil-800-luminarias-y-211-transformadores-en-tercera-entrega-al-1x10-del-Buen-Gobierno-2-1024x731.jpg 1024w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Distribuidas-m\u00e1s-de-6-mil-800-luminarias-y-211-transformadores-en-tercera-entrega-al-1x10-del-Buen-Gobierno-2-768x548.jpg 768w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Distribuidas-m\u00e1s-de-6-mil-800-luminarias-y-211-transformadores-en-tercera-entrega-al-1x10-del-Buen-Gobierno-2.jpg 1080w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>Igualmente, Miguel Tovar, tambi\u00e9n perteneciente de la flota pesada de Corpoelec \u2013 Gu\u00e1rico, consider\u00f3 de excelente el poder <strong>\u201catender las necesidades de cada sector y de cada municipio, es algo positivo para los beneficiados\u201d.<\/strong><\/p>\n<p>En la entrega de materiales y equipos tambi\u00e9n participaron el presidente de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), Ing. Jos\u00e9 Luis Betancourt; el presidente de Corpoelec Industrial, G\/D Juan Ram\u00f3n Rodr\u00edguez y los gerentes de Distribuci\u00f3n, Seguridad, Bienes y Servicios.<\/p>\n<p><strong>Prensa Corpoelec\u00a0<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-87540 size-full\" src=\"http:\/\/10.200.87.50\/mppee\/wp-content\/uploads\/2022\/07\/Distribuidas-m\u00e1s-de-6-mil-800-luminarias-y-211-transformadores-en-tercera-entrega-al-1x10-del-Buen-Gobierno-1.jpg\" alt=\"\" width=\"1080\" height=\"720\" srcset=\"https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Distribuidas-m\u00e1s-de-6-mil-800-luminarias-y-211-transformadores-en-tercera-entrega-al-1x10-del-Buen-Gobierno-1.jpg 1080w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Distribuidas-m\u00e1s-de-6-mil-800-luminarias-y-211-transformadores-en-tercera-entrega-al-1x10-del-Buen-Gobierno-1-300x200.jpg 300w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Distribuidas-m\u00e1s-de-6-mil-800-luminarias-y-211-transformadores-en-tercera-entrega-al-1x10-del-Buen-Gobierno-1-1024x683.jpg 1024w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2022\/07\/Distribuidas-m\u00e1s-de-6-mil-800-luminarias-y-211-transformadores-en-tercera-entrega-al-1x10-del-Buen-Gobierno-1-768x512.jpg 768w\" sizes=\"auto, (max-width: 1080px) 100vw, 1080px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Como parte de la tercera entrega de materiales e insumos el\u00e9ctricos para responder a las solicitudes de los ciudadanos realizadas<\/p>\n","protected":false},"author":12,"featured_media":87544,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[],"class_list":["post-87539","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nacionales"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/87539","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=87539"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/87539\/revisions"}],"predecessor-version":[{"id":87545,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/87539\/revisions\/87545"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/87544"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=87539"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=87539"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=87539"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}