{"id":88202,"date":"2022-10-17T16:57:00","date_gmt":"2022-10-17T16:57:00","guid":{"rendered":"http:\/\/10.200.87.50\/mppee\/?p=88202"},"modified":"2022-11-14T17:00:41","modified_gmt":"2022-11-14T17:00:41","slug":"avanza-en-un-95-recuperacion-de-la-vialidad-principal-y-ramales-del-casco-central-en-las-tejerias","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=88202","title":{"rendered":"Avanza en un 95% recuperaci\u00f3n de la vialidad principal y ramales del casco central en Las Tejer\u00edas"},"content":{"rendered":"<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-14334 size-medium\" src=\"http:\/\/intranet.mppee.gob.ve\/wordpress\/wp-content\/uploads\/2022\/10\/Avanza-en-un-95-recuperaci%C3%B3n-de-la-vialidad-principal-y-ramales-del-casco-central-en-Las-Tejer%C3%ADas-6-300x300.jpg\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" srcset=\"http:\/\/intranet.mppee.gob.ve\/wordpress\/wp-content\/uploads\/2022\/10\/Avanza-en-un-95-recuperaci\u00f3n-de-la-vialidad-principal-y-ramales-del-casco-central-en-Las-Tejer\u00edas-6-300x300.jpg 300w, http:\/\/intranet.mppee.gob.ve\/wordpress\/wp-content\/uploads\/2022\/10\/Avanza-en-un-95-recuperaci\u00f3n-de-la-vialidad-principal-y-ramales-del-casco-central-en-Las-Tejer\u00edas-6-150x150.jpg 150w, http:\/\/intranet.mppee.gob.ve\/wordpress\/wp-content\/uploads\/2022\/10\/Avanza-en-un-95-recuperaci\u00f3n-de-la-vialidad-principal-y-ramales-del-casco-central-en-Las-Tejer\u00edas-6.jpg 600w\" alt=\"\" width=\"300\" height=\"300\" \/>El vicepresidente Sectorial de Obras P\u00fablicas y Servicios, G\/J N\u00e9stor Reverol, asever\u00f3 este lunes que tras ocho d\u00edas de trabajos ininterrumpidos se alcanz\u00f3 la recuperaci\u00f3n en 95% de la vialidad principal y ramales del casco central de Las Tejer\u00edas, en el estado Aragua como parte de la labores de recuperaci\u00f3n de este sector que fue afectado recientemente por las fuertes lluvias.<\/p>\n<p style=\"text-align: justify;\">La informaci\u00f3n la dio a conocer el General en Jefe a trav\u00e9s de una publicaci\u00f3n en su cuenta oficial en la red social Instagram @reverolnestor, tras haber participado en una reuni\u00f3n de trabajo y evaluaci\u00f3n, que estuvo liderada por el presidente de la Rep\u00fablica, Nicol\u00e1s Maduro, donde se supervis\u00f3 las acciones desarrolladas en esta zona en materia de servicios b\u00e1sicos, alimentaci\u00f3n y vivienda.<\/p>\n<p style=\"text-align: justify;\">Referente al tema de despeje de escombros y saneamiento, destac\u00f3 que estas labores tienen un avance del 80%, lo que significa un total de 69 mil 592 m3 retirados en m\u00e1s de 3 mil viajes con maquinaria especializada.<\/p>\n<p style=\"text-align: justify;\">El tambi\u00e9n ministro para la Energ\u00eda El\u00e9ctrica, se\u00f1al\u00f3 adem\u00e1s que fueron restablecidos al 100% los alimentadores de los sectores residenciales: Tiara, Sigalca, Tejidos, Vidosa, Sabaneta, Curiepe y el servicio el\u00e9ctrico en los pozos de agua: Willi, Proagro, Monte Verde, Oropal, Mendoza y Refugio de Camioneros.<\/p>\n<p style=\"text-align: justify;\"><strong>\u201cAdem\u00e1s se instalaron nuevas luminarias LED en el dispensario m\u00e9dico y zonas de atenci\u00f3n operativa. Se incluye el trabajo de despeje de vegetaci\u00f3n sobre 25 troncales de circuitos, principales derivaciones y puntos de seccionamiento estrat\u00e9gico\u201d<\/strong>, agreg\u00f3.<\/p>\n<p style=\"text-align: justify;\">Finalmente, Reverol asegur\u00f3 que la uni\u00f3n c\u00edvico-militar-policial, legado del Comandante Eterno y L\u00edder de la Revoluci\u00f3n Bolivariana Hugo Ch\u00e1vez, se ha puesto de manifiesto en Las Tejer\u00edas.<\/p>\n<p><strong>Prensa Mppee<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-14331 aligncenter\" src=\"http:\/\/intranet.mppee.gob.ve\/wordpress\/wp-content\/uploads\/2022\/10\/Avanza-en-un-95-recuperaci%C3%B3n-de-la-vialidad-principal-y-ramales-del-casco-central-en-Las-Tejer%C3%ADas-3.jpg\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" srcset=\"http:\/\/intranet.mppee.gob.ve\/wordpress\/wp-content\/uploads\/2022\/10\/Avanza-en-un-95-recuperaci\u00f3n-de-la-vialidad-principal-y-ramales-del-casco-central-en-Las-Tejer\u00edas-3.jpg 600w, http:\/\/intranet.mppee.gob.ve\/wordpress\/wp-content\/uploads\/2022\/10\/Avanza-en-un-95-recuperaci\u00f3n-de-la-vialidad-principal-y-ramales-del-casco-central-en-Las-Tejer\u00edas-3-150x150.jpg 150w, http:\/\/intranet.mppee.gob.ve\/wordpress\/wp-content\/uploads\/2022\/10\/Avanza-en-un-95-recuperaci\u00f3n-de-la-vialidad-principal-y-ramales-del-casco-central-en-Las-Tejer\u00edas-3-300x300.jpg 300w\" alt=\"\" width=\"600\" height=\"600\" \/><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-14330 aligncenter\" src=\"http:\/\/intranet.mppee.gob.ve\/wordpress\/wp-content\/uploads\/2022\/10\/Avanza-en-un-95-recuperaci%C3%B3n-de-la-vialidad-principal-y-ramales-del-casco-central-en-Las-Tejer%C3%ADas-2.jpg\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" srcset=\"http:\/\/intranet.mppee.gob.ve\/wordpress\/wp-content\/uploads\/2022\/10\/Avanza-en-un-95-recuperaci\u00f3n-de-la-vialidad-principal-y-ramales-del-casco-central-en-Las-Tejer\u00edas-2.jpg 600w, http:\/\/intranet.mppee.gob.ve\/wordpress\/wp-content\/uploads\/2022\/10\/Avanza-en-un-95-recuperaci\u00f3n-de-la-vialidad-principal-y-ramales-del-casco-central-en-Las-Tejer\u00edas-2-150x150.jpg 150w, http:\/\/intranet.mppee.gob.ve\/wordpress\/wp-content\/uploads\/2022\/10\/Avanza-en-un-95-recuperaci\u00f3n-de-la-vialidad-principal-y-ramales-del-casco-central-en-Las-Tejer\u00edas-2-300x300.jpg 300w\" alt=\"\" width=\"600\" height=\"600\" \/><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-14329 aligncenter\" src=\"http:\/\/intranet.mppee.gob.ve\/wordpress\/wp-content\/uploads\/2022\/10\/Avanza-en-un-95-recuperaci%C3%B3n-de-la-vialidad-principal-y-ramales-del-casco-central-en-Las-Tejer%C3%ADas-1.jpg\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" srcset=\"http:\/\/intranet.mppee.gob.ve\/wordpress\/wp-content\/uploads\/2022\/10\/Avanza-en-un-95-recuperaci\u00f3n-de-la-vialidad-principal-y-ramales-del-casco-central-en-Las-Tejer\u00edas-1.jpg 600w, http:\/\/intranet.mppee.gob.ve\/wordpress\/wp-content\/uploads\/2022\/10\/Avanza-en-un-95-recuperaci\u00f3n-de-la-vialidad-principal-y-ramales-del-casco-central-en-Las-Tejer\u00edas-1-150x150.jpg 150w, http:\/\/intranet.mppee.gob.ve\/wordpress\/wp-content\/uploads\/2022\/10\/Avanza-en-un-95-recuperaci\u00f3n-de-la-vialidad-principal-y-ramales-del-casco-central-en-Las-Tejer\u00edas-1-300x300.jpg 300w\" alt=\"\" width=\"600\" height=\"600\" \/><\/p>\n<div class=\"post-views post-14328 entry-meta\">\u00a0<\/div>\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>El vicepresidente Sectorial de Obras P\u00fablicas y Servicios, G\/J N\u00e9stor Reverol, asever\u00f3 este lunes que tras ocho d\u00edas de trabajos<\/p>\n","protected":false},"author":12,"featured_media":88203,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[11],"class_list":["post-88202","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-mppee"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/88202","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=88202"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/88202\/revisions"}],"predecessor-version":[{"id":88204,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/88202\/revisions\/88204"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/88203"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=88202"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=88202"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=88202"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}