{"id":88475,"date":"2023-01-09T12:34:00","date_gmt":"2023-01-09T12:34:00","guid":{"rendered":"http:\/\/10.200.87.50\/mppee\/?p=88475"},"modified":"2023-01-10T12:46:11","modified_gmt":"2023-01-10T12:46:11","slug":"arranca-plan-de-inspecciones-y-mantenimiento-integral-del-sen-en-el-guri","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=88475","title":{"rendered":"Arranca Plan de Inspecciones y Mantenimiento Integral del SEN en el Guri"},"content":{"rendered":"<p style=\"font-weight: 400; text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-88480 alignleft\" src=\"http:\/\/10.200.87.50\/mppee\/wp-content\/uploads\/2023\/01\/Arranca-Plan-de-Inspecci\u00f3n-y-Mantenimiento-Integral-del-SEN-en-el-Guri-3-213x300.jpg\" alt=\"\" width=\"213\" height=\"300\" srcset=\"https:\/\/mppee.gob.ve\/wp-content\/uploads\/2023\/01\/Arranca-Plan-de-Inspecci\u00f3n-y-Mantenimiento-Integral-del-SEN-en-el-Guri-3-213x300.jpg 213w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2023\/01\/Arranca-Plan-de-Inspecci\u00f3n-y-Mantenimiento-Integral-del-SEN-en-el-Guri-3-728x1024.jpg 728w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2023\/01\/Arranca-Plan-de-Inspecci\u00f3n-y-Mantenimiento-Integral-del-SEN-en-el-Guri-3-768x1080.jpg 768w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2023\/01\/Arranca-Plan-de-Inspecci\u00f3n-y-Mantenimiento-Integral-del-SEN-en-el-Guri-3.jpg 910w\" sizes=\"auto, (max-width: 213px) 100vw, 213px\" \/>Este lunes arranc\u00f3 el Plan Nacional de Inspecciones y Mantenimiento Integral del Sistema El\u00e9ctrico Nacional (SEN) en las centrales hidroel\u00e9ctricas Sim\u00f3n Bol\u00edvar (Guri), Antonio Jos\u00e9 de Sucre (Macagua) y Francisco de Miranda (Caruachi), ubicadas en el Bajo Caron\u00ed, estado Bol\u00edvar.<\/p>\n<p style=\"font-weight: 400; text-align: justify;\">As\u00ed lo inform\u00f3 el vicepresidente Sectorial de Obras P\u00fablicas y Servicios, G\/J N\u00e9stor Reverol, quien lider\u00f3 dicho recorrido y estuvo en compa\u00f1\u00eda de la fuerza trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec).<\/p>\n<p style=\"font-weight: 400; text-align: justify;\"><strong>\u201cCumpliendo instrucciones del presidente de la Rep\u00fablica, Nicol\u00e1s Maduro, hemos arrancado hoy 9 de enero del 2023, el Plan Nacional de Inspecciones y Mantenimiento Integral del Sistema El\u00e9ctrico Nacional, haciendo un recorrido en el Guri, acci\u00f3n que permitir\u00e1 garantizar la continuidad de un servicio el\u00e9ctrico seguro y estable para los venezolanos\u201d<\/strong>, afirm\u00f3 el General en Jefe.<\/p>\n<p style=\"font-weight: 400; text-align: justify;\">Precis\u00f3 que durante la inspecci\u00f3n evaluaron la sala de control de Casa de M\u00e1quinas I y II, as\u00ed como los patios de 230, 400 y 765 KV. Tambi\u00e9n verificaron la operatividad de los equipos, sistemas y estructuras asociadas a las represas para mantener los niveles \u00f3ptimos de funcionamiento.<\/p>\n<p style=\"font-weight: 400; text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-88479 alignright\" src=\"http:\/\/10.200.87.50\/mppee\/wp-content\/uploads\/2023\/01\/Arranca-Plan-de-Inspecci\u00f3n-y-Mantenimiento-Integral-del-SEN-en-el-Guri-2_1-300x252.jpg\" alt=\"\" width=\"300\" height=\"252\" srcset=\"https:\/\/mppee.gob.ve\/wp-content\/uploads\/2023\/01\/Arranca-Plan-de-Inspecci\u00f3n-y-Mantenimiento-Integral-del-SEN-en-el-Guri-2_1-300x252.jpg 300w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2023\/01\/Arranca-Plan-de-Inspecci\u00f3n-y-Mantenimiento-Integral-del-SEN-en-el-Guri-2_1-1024x860.jpg 1024w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2023\/01\/Arranca-Plan-de-Inspecci\u00f3n-y-Mantenimiento-Integral-del-SEN-en-el-Guri-2_1-768x645.jpg 768w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2023\/01\/Arranca-Plan-de-Inspecci\u00f3n-y-Mantenimiento-Integral-del-SEN-en-el-Guri-2_1.jpg 1029w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>Adem\u00e1s, el tambi\u00e9n Ministro del Poder Popular para la Energ\u00eda El\u00e9ctrica (Mppee) se reuni\u00f3 con los gerentes de la Estatal el\u00e9ctrica para valorar tres ejes fundamentales: Atenci\u00f3n Integral de la Fuerza Trabajadora, el 1&#215;10 del Buen Gobierno y el Mantenimiento en todas las \u00e1reas sustantivas del SEN.<\/p>\n<p style=\"font-weight: 400; text-align: justify;\">El primer eje contempla el bienestar de los trabajadores en los \u00e1mbitos educativo, salud, vivienda y salario; le sigue la nueva forma de hacer gobierno con el 1&#215;10 que es un sistema de proximidad entre los trabajadores y el pueblo venezolano para garantizar un servicio el\u00e9ctrico confiable.<\/p>\n<p style=\"font-weight: 400; text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-88478 alignleft\" src=\"http:\/\/10.200.87.50\/mppee\/wp-content\/uploads\/2023\/01\/Arranca-Plan-de-Inspecci\u00f3n-y-Mantenimiento-Integral-del-SEN-en-el-Guri-2-183x300.jpg\" alt=\"\" width=\"183\" height=\"300\" srcset=\"https:\/\/mppee.gob.ve\/wp-content\/uploads\/2023\/01\/Arranca-Plan-de-Inspecci\u00f3n-y-Mantenimiento-Integral-del-SEN-en-el-Guri-2-183x300.jpg 183w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2023\/01\/Arranca-Plan-de-Inspecci\u00f3n-y-Mantenimiento-Integral-del-SEN-en-el-Guri-2-625x1024.jpg 625w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2023\/01\/Arranca-Plan-de-Inspecci\u00f3n-y-Mantenimiento-Integral-del-SEN-en-el-Guri-2-768x1259.jpg 768w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2023\/01\/Arranca-Plan-de-Inspecci\u00f3n-y-Mantenimiento-Integral-del-SEN-en-el-Guri-2.jpg 781w\" sizes=\"auto, (max-width: 183px) 100vw, 183px\" \/>El tercero y \u00faltimo incluye el Plan Nacional de Inspecciones y de Mantenimiento Integral del Sistema El\u00e9ctrico Nacional que se desarrollar\u00e1 este a\u00f1o en todas \u00e1reas de distribuci\u00f3n, transmisi\u00f3n, generaci\u00f3n, telecomunicaciones, seguridad, control de vegetaci\u00f3n y centros de despacho.<\/p>\n<p style=\"font-weight: 400; text-align: justify;\">Agreg\u00f3 Reverol que se iniciar\u00e1 un rol de supervisi\u00f3n semanal integrado por viceministros y gerentes generales para evaluar los procesos en las \u00e1reas medulares del SEN<\/p>\n<p style=\"font-weight: 400; text-align: justify;\"><strong>\u00a0Prensa Mppee<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-88476 size-large\" src=\"http:\/\/10.200.87.50\/mppee\/wp-content\/uploads\/2023\/01\/Arranca-Plan-de-Inspecci\u00f3n-y-Mantenimiento-Integral-del-SEN-en-el-Guri-1-698x1024.jpg\" alt=\"\" width=\"698\" height=\"1024\" srcset=\"https:\/\/mppee.gob.ve\/wp-content\/uploads\/2023\/01\/Arranca-Plan-de-Inspecci\u00f3n-y-Mantenimiento-Integral-del-SEN-en-el-Guri-1-698x1024.jpg 698w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2023\/01\/Arranca-Plan-de-Inspecci\u00f3n-y-Mantenimiento-Integral-del-SEN-en-el-Guri-1-205x300.jpg 205w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2023\/01\/Arranca-Plan-de-Inspecci\u00f3n-y-Mantenimiento-Integral-del-SEN-en-el-Guri-1-768x1126.jpg 768w, https:\/\/mppee.gob.ve\/wp-content\/uploads\/2023\/01\/Arranca-Plan-de-Inspecci\u00f3n-y-Mantenimiento-Integral-del-SEN-en-el-Guri-1.jpg 873w\" sizes=\"auto, (max-width: 698px) 100vw, 698px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Este lunes arranc\u00f3 el Plan Nacional de Inspecciones y Mantenimiento Integral del Sistema El\u00e9ctrico Nacional (SEN) en las centrales hidroel\u00e9ctricas<\/p>\n","protected":false},"author":12,"featured_media":88477,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[11],"class_list":["post-88475","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-mppee"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/88475","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=88475"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/88475\/revisions"}],"predecessor-version":[{"id":88481,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/88475\/revisions\/88481"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/88477"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=88475"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=88475"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=88475"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}