{"id":90592,"date":"2024-06-01T01:31:05","date_gmt":"2024-06-01T01:31:05","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=90592"},"modified":"2024-06-01T01:37:09","modified_gmt":"2024-06-01T01:37:09","slug":"ministro-marquez-inspecciono-obras-de-rehabilitacion-de-la-planta-de-generacion-termozulia","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=90592","title":{"rendered":"Ministro M\u00e1rquez inspeccion\u00f3 obras de rehabilitaci\u00f3n de la planta de Generaci\u00f3n Termozulia"},"content":{"rendered":"\n<p><strong>Maracaibo, estado Zulia.-<\/strong> El ministro del Poder Popular para la Energ\u00eda El\u00e9ctrica, Jorge M\u00e1rquez, realiz\u00f3 una inspecci\u00f3n al Complejo de Generaci\u00f3n Termoel\u00e9ctrica G\/J Rafael Urdaneta, tambi\u00e9n conocida como TermoZulia, para verificar el avance de las obras de rehabilitaci\u00f3n de esa importante estructura.<\/p>\n\n\n\n<p>El Complejo ubicado en el sector Palmarejo, municipio La Ca\u00f1ada de Urdaneta, parroquia Chiquinquir\u00e1, tiene como responsabilidad generar la mayor parte del suministro el\u00e9ctrico para el estado Zulia.<\/p>\n\n\n\n<p>El objetivo de la visita realizada es constatar los avances de los trabajos t\u00e9cnicos y de rehabilitaci\u00f3n, as\u00ed como tambi\u00e9n inspeccionar la infraestructura donde operar\u00e1 la fuerza trabajadora de sector.<\/p>\n\n\n\n<p>En el recorrido, M\u00e1rquez observ\u00f3 las labores de armado de piezas para las unidades de generaci\u00f3n, la limpieza y desmalezamiento de las \u00e1reas verdes, entre otras acciones para el reacondicionamiento del complejo el\u00e9ctrico.<\/p>\n\n\n\n<p>Igualmente recorri\u00f3 el Centro de Servicio Caujarito, punto donde se supervisa el despacho de carga el\u00e9ctrica para el pueblo zuliano.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec\/Lyan Pe\u00f1aloza<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Maracaibo, estado Zulia.- El ministro del Poder Popular para la Energ\u00eda El\u00e9ctrica, Jorge M\u00e1rquez, realiz\u00f3 una inspecci\u00f3n al Complejo de<\/p>\n","protected":false},"author":22,"featured_media":90593,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30,7],"tags":[11],"class_list":["post-90592","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","category-sen","tag-mppee"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/90592","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=90592"}],"version-history":[{"count":2,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/90592\/revisions"}],"predecessor-version":[{"id":90596,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/90592\/revisions\/90596"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/90593"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=90592"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=90592"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=90592"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}