{"id":91077,"date":"2024-08-15T00:04:42","date_gmt":"2024-08-15T00:04:42","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=91077"},"modified":"2024-08-15T00:04:45","modified_gmt":"2024-08-15T00:04:45","slug":"plan-nacional-de-inspecciones-al-sen-llega-al-estado-trujillo","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=91077","title":{"rendered":"Plan Nacional de Inspecciones al SEN llega al estado Trujillo"},"content":{"rendered":"\n<p><strong>Valera, estado Trujillo.-<\/strong> Con el prop\u00f3sito de fortalecer el Sistema El\u00e9ctrico Nacional (SEN), el ministro del Poder Popular para la Energ\u00eda El\u00e9ctrica, Jorge M\u00e1rquez, inspeccion\u00f3 este mi\u00e9rcoles el Centro Nacional de Despacho Sur Occidente, ubicado en la Subestaci\u00f3n El\u00e9ctrica Valera II en el estado Trujillo. <\/p>\n\n\n\n<p>En el recorrido, la autoridad nacional de energ\u00eda el\u00e9ctrica convers\u00f3 con los trabajadores y trabajadoras para sumar ideas a ejecutar en favor del SEN. <\/p>\n\n\n\n<p>Esta subestaci\u00f3n el\u00e9ctrica es el punto de partida del SEN para distribuir la energ\u00eda el\u00e9ctrica en toda la regi\u00f3n Sur-Occidental de Venezuela. <\/p>\n\n\n\n<p>La visita del tambi\u00e9n Vicepresidente Sectorial de Obras P\u00fablicas y Servicios forma parte del Plan Nacional de Inspecciones y Mantenimiento Integral para robustecer el suministro el\u00e9ctrico en el territorio nacional. <\/p>\n\n\n\n<p>En reiteradas ocasiones, el presidente de la Rep\u00fablica, Nicol\u00e1s Maduro, ha llamado a resguardar la infraestructura del SEN y fortalecer sus capacidades para ofrecer un servicio m\u00e1s confiable y eficiente a los venezolanos. <\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec\/ Rosiris Ortega<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Valera, estado Trujillo.- Con el prop\u00f3sito de fortalecer el Sistema El\u00e9ctrico Nacional (SEN), el ministro del Poder Popular para la<\/p>\n","protected":false},"author":22,"featured_media":91078,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15,7],"tags":[2691,11,2702,46],"class_list":["post-91077","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nacionales","category-sen","tag-corpoelec","tag-mppee","tag-trujillo","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/91077","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=91077"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/91077\/revisions"}],"predecessor-version":[{"id":91079,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/91077\/revisions\/91079"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/91078"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=91077"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=91077"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=91077"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}