{"id":91620,"date":"2024-09-25T20:23:04","date_gmt":"2024-09-25T20:23:04","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=91620"},"modified":"2024-09-25T20:23:48","modified_gmt":"2024-09-25T20:23:48","slug":"corpoelec-construyo-nueva-torre-de-transmision-de-la-linea-santa-teresa-iii-caucagua","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=91620","title":{"rendered":"Corpoelec construy\u00f3 nueva torre\u00a0 de transmisi\u00f3n de la l\u00ednea Santa Teresa III-Caucagua"},"content":{"rendered":"\n<p><strong>Estado Miranda.- <\/strong>La Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) construy\u00f3 nueva torre el\u00e9ctrica N2, para fortalecer la transmisi\u00f3n de energ\u00eda de la l\u00ednea Santa Teresa\u00a0 III &#8211; Caucagua, Ternas\u00a0 I y II de\u00a0 115 kV y el sistema de bombeo de Hidrocapital en Guarenas-Guatire y parte de la Gran Caracas.<\/p>\n\n\n\n<p>Los trabajos iniciaron en el sector El Hoyito del municipio Independencia, estado Miranda, donde el personal operativo de Transmisi\u00f3n en la entidad junto al equipo de los Aliados&nbsp; Condulec, evaluaron las condiciones de la antigua torre, la cual se encontraba con sus bases al descubierto a las orillas del r\u00edo Guaire, representando una condici\u00f3n de riesgo para la estabilidad del sistema el\u00e9ctrico.<\/p>\n\n\n\n<p>Con apoyo del personal de Ingenier\u00eda y&nbsp; Mantenimiento de l\u00edneas de Transmisi\u00f3n se efectu\u00f3 el traslado de maquinarias pesadas y&nbsp; perforadoras, para la excavaci\u00f3n de la obra de construcci\u00f3n.<\/p>\n\n\n\n<p>En este sentido, la clase trabajadora&nbsp; instal\u00f3&nbsp; cuatro&nbsp; retenidas adicionales en la torre N\u00b0 2&nbsp; e incorpor\u00f3&nbsp; 1.500 perfiles&nbsp; de diferentes medidas, torniller\u00eda, tuercas, arandelas planas y de presi\u00f3n galvanizadas, para la construcci\u00f3n de las fundaciones.<\/p>\n\n\n\n<p>Un total de 50 trabajadores realizaron el desmontaje e izado, conexi\u00f3n de conductores de potencia, liberaci\u00f3n y&nbsp; ensamblaje de los cuerpos superiores, m\u00e9nsula y fijaci\u00f3n de conductores, quedando operativa y en servicio la l\u00ednea.<\/p>\n\n\n\n<p>Estos trabajos significan un compromiso adquirido por la Estatal el\u00e9ctrica, para garantizar un servicio confiable y de calidad a m\u00e1s de 60.500 familias que dependen de los circuitos Caf\u00e9, El Clavo, Pepsi, Bimbo, Caucagua, Araguita e Inos de la subestaci\u00f3n Caucagua y al sistema de bombeo de los municipios Plaza, Zamora del estado Miranda y parte de la Gran Caracas.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- La Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) construy\u00f3 nueva torre el\u00e9ctrica N2, para fortalecer la transmisi\u00f3n de energ\u00eda de la<\/p>\n","protected":false},"author":22,"featured_media":91623,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30],"tags":[2691,2709,11,46],"class_list":["post-91620","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","tag-corpoelec","tag-miranda","tag-mppee","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/91620","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=91620"}],"version-history":[{"count":2,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/91620\/revisions"}],"predecessor-version":[{"id":91625,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/91620\/revisions\/91625"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/91623"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=91620"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=91620"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=91620"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}