{"id":91706,"date":"2024-09-30T21:52:28","date_gmt":"2024-09-30T21:52:28","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=91706"},"modified":"2024-09-30T21:52:30","modified_gmt":"2024-09-30T21:52:30","slug":"corpoelec-aplica-control-vegetacion-en-redes-electricas-de-merida","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=91706","title":{"rendered":"Corpoelec aplica control vegetaci\u00f3n en redes el\u00e9ctricas de M\u00e9rida"},"content":{"rendered":"\n<p><strong>Estado M\u00e9rida.-<\/strong> La Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) inici\u00f3 el mantenimiento preventivo en 41 circuitos de los municipios del estado M\u00e9rida, a fin de desmalezar y despejar la vegetaci\u00f3n en 2 mil 940 kil\u00f3metros de l\u00edneas el\u00e9ctricas.<\/p>\n\n\n\n<p>Las labores, enmarcadas en el Plan Pica y Poda que adelanta la estatal el\u00e9ctrica a escala nacional, se ejecutaron a trav\u00e9s de la Gerencia General de Programaci\u00f3n y Control de Vegetaci\u00f3n (PCV), conjuntamente con las cuadrillas de Distribuci\u00f3n adscritas a Corpoelec en la entidad andina.<\/p>\n\n\n\n<p>Con estas acciones, que favorece a 41 circuitos el\u00e9ctricos, se busca minimizar las aver\u00edas por incidencia de vegetaci\u00f3n en \u00e9poca de lluvias, adem\u00e1s de garantizar la seguridad de las cuadrillas operativas al momento de realizar el mantenimiento preventivo y correctivo.<\/p>\n\n\n\n<p>Las acciones ser\u00e1n efectuadas de manera simult\u00e1nea en los 23 municipios atendidos por Corpoelec, a fin de cumplir con el Plan Pica y Poda a nivel en los circuitos de 13,8 kV.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado M\u00e9rida.- La Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) inici\u00f3 el mantenimiento preventivo en 41 circuitos de los municipios del estado M\u00e9rida,<\/p>\n","protected":false},"author":24,"featured_media":91707,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30,7],"tags":[2691,2742,11,46],"class_list":["post-91706","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","category-sen","tag-corpoelec","tag-merida","tag-mppee","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/91706","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=91706"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/91706\/revisions"}],"predecessor-version":[{"id":91708,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/91706\/revisions\/91708"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/91707"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=91706"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=91706"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=91706"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}