{"id":91948,"date":"2024-10-16T15:39:46","date_gmt":"2024-10-16T15:39:46","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=91948"},"modified":"2024-10-16T15:39:48","modified_gmt":"2024-10-16T15:39:48","slug":"corpoelec-activo-banco-de-reguladores-de-voltaje-en-la-ciudad-socialista-ali-primera-en-lara","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=91948","title":{"rendered":"Corpoelec activ\u00f3 banco de reguladores de voltaje en la Ciudad Socialista Al\u00ed Primera en Lara"},"content":{"rendered":"\n<p><strong>Barquisimeto, estado Lara.-<\/strong> Con el prop\u00f3sito de avanzar en el fortalecimiento de los sistemas de distribuci\u00f3n en la regi\u00f3n larense, la clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) reactiv\u00f3 un banco de reguladores que beneficia a m\u00e1s de 16 mil personas\u00a0 en la Ciudad Socialista Al\u00ed Primera en el norte de Barquisimeto.<\/p>\n\n\n\n<p>Las labores, orientadas por la Gerencia Territorial y desarrolladas por la clase trabajadora adscrita a la Gerencia de Distribuci\u00f3n, comprendieron diagn\u00f3sticos, revisi\u00f3n de l\u00edneas, mantenimiento y sustituci\u00f3n de equipos en los dispositivos reguladores de voltaje de 500 Amp y 14.4 kVA.<\/p>\n\n\n\n<p>Estas labores de mantenimiento se realizan en las instalaciones el\u00e9ctricas de la entidad, para contribuir en maximizar la calidad del voltaje en los apartamentos del urbanismo multifamiliar ubicado en el eje de las parroquias Cuj\u00ed-Tamaca en el municipio Iribarren.<\/p>\n\n\n\n<p>Los trabajos t\u00e9cnicos forman parte&nbsp; del Plan de Estabilizaci\u00f3n y Fortalecimiento del Sistema El\u00e9ctrico Nacional (SEN)&nbsp;que adelanta el Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE) a fin de consolidar y garantizar una mayor confiabilidad a la red de distribuci\u00f3n el\u00e9ctrica para el buen vivir de la poblaci\u00f3n.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Barquisimeto, estado Lara.- Con el prop\u00f3sito de avanzar en el fortalecimiento de los sistemas de distribuci\u00f3n en la regi\u00f3n larense,<\/p>\n","protected":false},"author":24,"featured_media":91949,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30,7],"tags":[2691,2690,11,46],"class_list":["post-91948","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","category-sen","tag-corpoelec","tag-lara","tag-mppee","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/91948","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=91948"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/91948\/revisions"}],"predecessor-version":[{"id":91950,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/91948\/revisions\/91950"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/91949"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=91948"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=91948"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=91948"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}