{"id":92003,"date":"2024-10-18T13:37:54","date_gmt":"2024-10-18T13:37:54","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=92003"},"modified":"2024-10-18T13:50:14","modified_gmt":"2024-10-18T13:50:14","slug":"realizan-mantenimiento-correctivo-a-la-linea-69-kv-en-la-guaira","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=92003","title":{"rendered":"Realizan mantenimiento correctivo a la l\u00ednea 69 kV en La Guaira"},"content":{"rendered":"\n<p><strong>Estado La Guaira.- <\/strong>Personal de la Gerencia de Transmisi\u00f3n de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) realiz\u00f3 mantenimiento correctivo a la l\u00ednea 69 kV con el objetivo de mejorar la transmisi\u00f3n de energ\u00eda a las subestaciones del litoral.<\/p>\n\n\n\n<p>Las subestaciones el\u00e9ctricas atendidas fueron Caraballeda, Longa Espa\u00f1a, Anare, Los Caracas, Todasana, La Sabana y Chuspa, instalaciones que distribuyen electricidad\u00a0a las parroquias Caraballeda, Naiguat\u00e1 y Caruao en la entidad.<\/p>\n\n\n\n<p>El trabajo contempl\u00f3 la sustituci\u00f3n de 54 aisladores entre las torres 52 y 53, para proteger 48 MWA del sistema de transmisi\u00f3n, favoreciendo a los sectores asociados a las parroquias g\u00fcairenses.<\/p>\n\n\n\n<p>Estas labores correctivas tienen como objetivo garantizar la estabilidad y confiabilidad del servicio el\u00e9ctrico en la entidad guaire\u00f1a a fin de brindar un \u00f3ptimo servicio a la poblaci\u00f3n.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado La Guaira.- Personal de la Gerencia de Transmisi\u00f3n de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) realiz\u00f3 mantenimiento correctivo a la<\/p>\n","protected":false},"author":24,"featured_media":92004,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30,7],"tags":[2691,2743,11,46],"class_list":["post-92003","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","category-sen","tag-corpoelec","tag-la-guaira","tag-mppee","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92003","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=92003"}],"version-history":[{"count":2,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92003\/revisions"}],"predecessor-version":[{"id":92007,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92003\/revisions\/92007"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/92004"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=92003"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=92003"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=92003"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}