{"id":92032,"date":"2024-10-19T15:12:49","date_gmt":"2024-10-19T15:12:49","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=92032"},"modified":"2024-10-19T15:12:51","modified_gmt":"2024-10-19T15:12:51","slug":"corpoelec-favorece-a-mas-380-mil-habitantes-de-barinas-con-maniobras-preventivas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=92032","title":{"rendered":"Corpoelec favorece a m\u00e1s 380 mil habitantes de Barinas con maniobras preventivas"},"content":{"rendered":"\n<p><strong>Estado Barinas.-\u00a0\u00a0<\/strong>El personal de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) realiz\u00f3 labores preventivas en subestaciones y circuitos del estado Barinas, para garantizar un servicio confiable a m\u00e1s 380 mil habitantes de la entidad llanera.<\/p>\n\n\n\n<p>En la subestaci\u00f3n Barinas II, la clase trabajadora limpi\u00f3 los aisladores&nbsp;&nbsp;en el transformador de potencia n\u00famero 1 y adecu\u00f3 las conexiones en el bushing de baja, asociadas a la fase T.<\/p>\n\n\n\n<p>Mientras que, en la infraestructura el\u00e9ctrica de 115 kV Varyn\u00e1, las maniobras permitieron ajustar los sistemas de protecciones y aplicar mantenimiento al equipo de potencia m\u00f3vil.<\/p>\n\n\n\n<p>Los integrantes de la Corporaci\u00f3n tambi\u00e9n abordaron 26 circuitos, para despejar la vegetaci\u00f3n y ajustar l\u00edneas, adem\u00e1s de sustituir conductores, fusibles y aisladores.<\/p>\n\n\n\n<p>Estos trabajos fueron planificados luego de la inspecci\u00f3n detallada de los sistemas de transmisi\u00f3n y distribuci\u00f3n, con el objetivo de asegurar el suministro el\u00e9ctrico en las parroquias&nbsp;&nbsp;Alto Barinas, Manuel Palacio Fajardo, Juan Antonio Rodr\u00edguez Dom\u00ednguez, Dominga Ortiz de P\u00e1ez, Barinitas, Obispos, El Tambor, El Carmen, Alfredo Arvelo Larriva, R\u00f3mulo Betancourt, El Real, Ciudad Bolivia, Puerto Nutrias, y Ticoporo.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Barinas.-\u00a0\u00a0El personal de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) realiz\u00f3 labores preventivas en subestaciones y circuitos del estado Barinas, para<\/p>\n","protected":false},"author":22,"featured_media":92033,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30,7],"tags":[2698,2691,11,2744,46],"class_list":["post-92032","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","category-sen","tag-barinas","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92032","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=92032"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92032\/revisions"}],"predecessor-version":[{"id":92034,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92032\/revisions\/92034"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/92033"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=92032"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=92032"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=92032"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}