{"id":92087,"date":"2024-10-23T16:29:07","date_gmt":"2024-10-23T16:29:07","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=92087"},"modified":"2024-10-23T16:29:09","modified_gmt":"2024-10-23T16:29:09","slug":"instalacion-de-interruptor-h-205-en-subestacion-santa-lucia-beneficia-a-mas-de-41-mil-usuarios","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=92087","title":{"rendered":"Instalaci\u00f3n de interruptor H-205 en subestaci\u00f3n Santa Luc\u00eda beneficia a m\u00e1s de 41 mil usuarios"},"content":{"rendered":"\n<p><strong>Estado Miranda.-<\/strong> Para garantizar el servicio el\u00e9ctrico a 41 mil 400 usuarios, en el estado Miranda, la clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) instal\u00f3 un nuevo interruptor H-205 en la subestaci\u00f3n Santa Luc\u00eda, eje Valles del Tuy.<\/p>\n\n\n\n<p>Para la puesta en servicio del interruptor H-205, se llev\u00f3 a cabo la conexi\u00f3n de potencia, levantamiento y conexi\u00f3n del cableado asociado al sistema de mando, control, se\u00f1alizaci\u00f3n, alarma y protecci\u00f3n, as\u00ed como el fortalecimiento del sistema de puesta a tierra de los equipos instalados para resguardar y garantizar el buen funcionamiento de su operatividad.<\/p>\n\n\n\n<p>Asimismo, se efectuaron pruebas funcionales de forma local y a distancia, adem\u00e1s de verificaci\u00f3n de camino y prueba de actuaci\u00f3n del esquema de protecciones, como acci\u00f3n preventiva para el correcto funcionamiento en la instalaci\u00f3n el\u00e9ctrica.<\/p>\n\n\n\n<p>Estos trabajos correctivos refuerzan y proporcionan confiabilidad en el anillo Valles del Tuy, al tiempo que se activa la operatividad de la l\u00ednea Diego Losada &#8211; Santa Lucia a 115 kV, mejorando los perfiles de tensiones de la regi\u00f3n.<\/p>\n\n\n\n<p>La Subestaci\u00f3n Santa Luc\u00eda surte de energ\u00eda el\u00e9ctrica a los circuitos de distribuci\u00f3n La Aguada, Santa Luc\u00eda, Pichao, Promotuy, La Virginia y Santa Epifan\u00eda a 13,8 Kv.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- Para garantizar el servicio el\u00e9ctrico a 41 mil 400 usuarios, en el estado Miranda, la clase trabajadora de<\/p>\n","protected":false},"author":24,"featured_media":92088,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30,7],"tags":[2691,2709,11,2744,46],"class_list":["post-92087","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","category-sen","tag-corpoelec","tag-miranda","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92087","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=92087"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92087\/revisions"}],"predecessor-version":[{"id":92089,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92087\/revisions\/92089"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/92088"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=92087"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=92087"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=92087"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}