{"id":92109,"date":"2024-10-24T14:38:51","date_gmt":"2024-10-24T14:38:51","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=92109"},"modified":"2024-10-24T14:38:54","modified_gmt":"2024-10-24T14:38:54","slug":"mejoran-circuito-electrico-para-beneficiar-a-mas-1-000-familias-de-la-guaira","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=92109","title":{"rendered":"Mejoran circuito el\u00e9ctrico para beneficiar a m\u00e1s 1.000 familias de La Guaira"},"content":{"rendered":"\n<p>Estado La Guaira.- La Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) a trav\u00e9s de la Gerencia de Distribuci\u00f3n, realiz\u00f3 un mantenimiento correctivo en el circuito Tacagua B3 de la parroquia Urimare, en La Guaira, con el objetivo de mejorar el suministro de energ\u00eda a m\u00e1s de 1.000 familias residenciadas en Playa Grande y Mare Abajo.<\/p>\n\n\n\n<p>El trabajo, que tambi\u00e9n beneficia a los comercios de la zona, contempl\u00f3 la sustituci\u00f3n de 150 metros conductor a\u00e9reo de media tensi\u00f3n, adem\u00e1s se instalaron 6 aisladores de retenci\u00f3n y 3 aisladores de paso, lo que permitir\u00e1 proteger el sistema de distribuci\u00f3n.<\/p>\n\n\n\n<p>De igual manera, el personal t\u00e9cnico efectu\u00f3 trabajos en la casilla donde se ubica el banco de transformadores de 300 kVA del circuito, a fin de colocar la puesta a tierra que permiten normalizar el voltaje en la zona.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado La Guaira.- La Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) a trav\u00e9s de la Gerencia de Distribuci\u00f3n, realiz\u00f3 un mantenimiento correctivo en<\/p>\n","protected":false},"author":24,"featured_media":92110,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30,7],"tags":[2691,2743,11,2744,46],"class_list":["post-92109","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","category-sen","tag-corpoelec","tag-la-guaira","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92109","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=92109"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92109\/revisions"}],"predecessor-version":[{"id":92111,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92109\/revisions\/92111"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/92110"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=92109"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=92109"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=92109"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}