{"id":92154,"date":"2024-10-26T16:32:00","date_gmt":"2024-10-26T16:32:00","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=92154"},"modified":"2024-10-26T16:32:02","modified_gmt":"2024-10-26T16:32:02","slug":"labores-preventivas-en-subestacion-guiria-favorecen-a-mas-de-21-mil-habitantes","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=92154","title":{"rendered":"Labores preventivas en Subestaci\u00f3n G\u00fciria favorecen a m\u00e1s de 21 mil habitantes"},"content":{"rendered":"\n<p><strong>G\u00fciria, estado Sucre.-<\/strong> Dando continuidad al Plan de Mantenimiento Integral del Sistema El\u00e9ctrico Nacional (SEN), el personal operativo adscrito a la gerencia estadal de Transmisi\u00f3n de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) en el estado Sucre, llev\u00f3 a cabo labores correctivas y preventivas en la subestaci\u00f3n G\u00fciria, para favorecer a m\u00e1s de 21 mil usuarios de la entidad oriental.<\/p>\n\n\n\n<p>La jornada de trabajo comprendi\u00f3 mantenimiento general al transformador N\u00b01 que surte de energ\u00eda el\u00e9ctrica a los circuitos Yoco, G\u00fciria y Puerto Pesquero de la subestaci\u00f3n el\u00e9ctrica, reemplazo de seccionador monopolar D-303, cambio de los elementos del man\u00f3metro H-110, correcci\u00f3n de puntos calientes y sustituci\u00f3n de varios puentes asociados a las salidas de 13.8 Kv de esa l\u00ednea.<\/p>\n\n\n\n<p>Con estos trabajos t\u00e9cnicos, la estatal el\u00e9ctrica garantiza el funcionamiento de los equipos, asegurando la continuidad del servicio el\u00e9ctrico, al tiempo que mejora los procesos de generaci\u00f3n y transmisi\u00f3n en la entidad.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>G\u00fciria, estado Sucre.- Dando continuidad al Plan de Mantenimiento Integral del Sistema El\u00e9ctrico Nacional (SEN), el personal operativo adscrito a<\/p>\n","protected":false},"author":24,"featured_media":92155,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30,7],"tags":[2691,11,2744,2693,46],"class_list":["post-92154","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","category-sen","tag-corpoelec","tag-mppee","tag-sen","tag-sucre","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92154","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=92154"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92154\/revisions"}],"predecessor-version":[{"id":92156,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92154\/revisions\/92156"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/92155"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=92154"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=92154"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=92154"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}