{"id":92255,"date":"2024-11-01T15:54:17","date_gmt":"2024-11-01T15:54:17","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=92255"},"modified":"2024-11-01T22:38:29","modified_gmt":"2024-11-01T22:38:29","slug":"mas-de-340-mil-habitantes-atendidos-con-mantenimientos-preventivos-en-barinas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=92255","title":{"rendered":"M\u00e1s de 340 mil habitantes atendidos con mantenimientos preventivos en Barinas\u00a0"},"content":{"rendered":"\n<p><strong>Estado Barinas.-<\/strong>&nbsp;La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) se despleg\u00f3 en 31 circuitos del estado Barinas, para realizar maniobras que optimizan la distribuci\u00f3n de la energ\u00eda en la entidad llanera.<\/p>\n\n\n\n<p>El reemplazo de seccionadores, instalaci\u00f3n de cortacorrientes, poda de \u00e1rboles y adecuaciones a componentes de media tensi\u00f3n asociados a transformadores, fueron parte de las labores desempe\u00f1adas por el personal de Corpoelec.<\/p>\n\n\n\n<p>Estos trabajos mejoran significativamente el servicio el\u00e9ctrico brindado en comunidades de los municipios Capital, Alberto Arvelo Torrealba, Antonio Jos\u00e9 de Sucre, Bol\u00edvar, Cruz Paredes, Ezequiel Zamora, Obispos, Pedraza y Rojas.<\/p>\n\n\n\n<p>Previamente, los t\u00e9cnicos e ingenieros eval\u00faan el funcionamiento de cada circuito, lo que les permite diagnosticar qu\u00e9 maniobras amerita la red para optimizar la entrega de energ\u00eda en cada sector de la entidad llanera.<\/p>\n\n\n\n<p>Maribel Castillo, habitante de la parroquia Ciudad Bolivia, indic\u00f3 \u201cel personal est\u00e1 cumpliendo con su labor, realizando mantenimientos, esto nos genera tranquilidad y bienestar a nosotros los usuarios\u201d.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Barinas.-&nbsp;La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) se despleg\u00f3 en 31 circuitos del estado Barinas, para realizar<\/p>\n","protected":false},"author":22,"featured_media":92256,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30,7],"tags":[2698,2691,11,2744,46],"class_list":["post-92255","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","category-sen","tag-barinas","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92255","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=92255"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92255\/revisions"}],"predecessor-version":[{"id":92257,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92255\/revisions\/92257"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/92256"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=92255"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=92255"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=92255"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}