{"id":92375,"date":"2024-11-09T15:25:15","date_gmt":"2024-11-09T15:25:15","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=92375"},"modified":"2024-11-09T15:25:18","modified_gmt":"2024-11-09T15:25:18","slug":"favorecen-a-mas-de-8-mil-usuarios-con-instalacion-de-equipos-en-la-subestacion-la-raiza","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=92375","title":{"rendered":"Favorecen a m\u00e1s de 8 mil usuarios con instalaci\u00f3n de equipos en la subestaci\u00f3n La Raiza"},"content":{"rendered":"\n<p><strong>Estado Miranda.-<\/strong> Con el objetivo de brindar un servicio confiable a m\u00e1s de 8 mil usuarios del eje Tuy, la clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) instal\u00f3 un nuevo banco de bater\u00edas en la subestaci\u00f3n la Raiza, ubicada en el municipio Paz Castillo del estado Miranda.<\/p>\n\n\n\n<p>El plan de trabajo se centr\u00f3 en la sustituci\u00f3n de 10 bater\u00edas asociadas a los servicios auxiliares a la m\u00f3vil de 10 MVA, para mejorar el suministro de energ\u00eda en los circuitos Frigor\u00edfico y Guaicaipuro, beneficiando a la poblaci\u00f3n de las comunidades El Cartanal, La Churuata, Manguito, Los Caracas, entre otros.<\/p>\n\n\n\n<p>Durante el desarrollo de estos trabajos, los t\u00e9cnicos de Mantenimiento Especializado de Subestaciones y el Centro de Servicio Santa Teresa, tambi\u00e9n instalaron un rel\u00e9 para proteger los equipos de potencia y optimizar la red de distribuci\u00f3n el\u00e9ctrica en los Valles del Tuy.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- Con el objetivo de brindar un servicio confiable a m\u00e1s de 8 mil usuarios del eje Tuy, la<\/p>\n","protected":false},"author":24,"featured_media":92376,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30,7],"tags":[2691,2709,11,2744,46],"class_list":["post-92375","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","category-sen","tag-corpoelec","tag-miranda","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92375","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=92375"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92375\/revisions"}],"predecessor-version":[{"id":92377,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92375\/revisions\/92377"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/92376"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=92375"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=92375"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=92375"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}