{"id":92562,"date":"2024-11-18T14:43:36","date_gmt":"2024-11-18T14:43:36","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=92562"},"modified":"2024-11-18T14:43:38","modified_gmt":"2024-11-18T14:43:38","slug":"labores-correctivas-fortalecen-transmision-de-energia-mas-de-500-mil-usuarios-mirandinos","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=92562","title":{"rendered":"Labores correctivas fortalecen transmisi\u00f3n de energ\u00eda m\u00e1s de 500 mil usuarios mirandinos"},"content":{"rendered":"\n<p><strong>Estado Miranda.-<\/strong> Para favorecer a m\u00e1s de 500 mil usuarios de los Valles del Tuy, la clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) realiz\u00f3 labores correctivas en el autotransformador de potencia N1, asociado a la subestaci\u00f3n Diego Losada 400\/230\/115 kV del eje Tuy.<\/p>\n\n\n\n<p>Gracias a la sustituci\u00f3n de componentes, seccionadores, correcci\u00f3n de puntos calientes del lado de alta del autotransformador N1, se normalizaron los equipos de potencia y se fortaleci\u00f3 el sistema de transmisi\u00f3n de energ\u00eda el\u00e9ctrica en los municipios Independencia, Paz Castillo, Crist\u00f3bal Rojas, Tom\u00e1s Lander y Rafael Urdaneta del estado Miranda.<\/p>\n\n\n\n<p>Igualmente, se realiz\u00f3 una inspecci\u00f3n termogr\u00e1fica para evaluar las condiciones, medir la temperatura y la distribuci\u00f3n del calor en los equipos, a fin de constatar el buen funcionamiento.<\/p>\n\n\n\n<p>Los trabajos efectuados por la cuadrilla de Mantenimiento de Subestaciones El\u00e9ctricas de la Gerencia de Transmisi\u00f3n en la entidad, forman parte del Plan de Estabilizaci\u00f3n y Fortalecimiento del sistema el\u00e9ctrico en la entidad mirandina.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- Para favorecer a m\u00e1s de 500 mil usuarios de los Valles del Tuy, la clase trabajadora de la<\/p>\n","protected":false},"author":24,"featured_media":92563,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30,7],"tags":[2691,2709,11,2744,46],"class_list":["post-92562","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","category-sen","tag-corpoelec","tag-miranda","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92562","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=92562"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92562\/revisions"}],"predecessor-version":[{"id":92564,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92562\/revisions\/92564"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/92563"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=92562"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=92562"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=92562"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}