{"id":92623,"date":"2024-11-20T18:49:10","date_gmt":"2024-11-20T18:49:10","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=92623"},"modified":"2024-11-20T18:49:12","modified_gmt":"2024-11-20T18:49:12","slug":"instalacion-de-tendido-electrico-fortalece-el-servicio-en-sectores-de-la-entidad-deltana","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=92623","title":{"rendered":"Instalaci\u00f3n de tendido el\u00e9ctrico fortalece el servicio en sectores de la entidad deltana"},"content":{"rendered":"\n<p><strong>Delta Amacuro.- <\/strong>En aras de fortalecer la continuidad del servicio el\u00e9ctrico en el estado Delta Amacuro, personal de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) se despleg\u00f3 hasta la parroquia Leonardo Ruiz Pineda para instalar un tendido el\u00e9ctrico.<\/p>\n\n\n\n<p>M\u00e1s de 320 familias de los sectores Los Almendrones y Deltaven III fueron favorecidas, con una jornada que se llev\u00f3 a cabo gracias a los esfuerzos del equipo adscrito a la Gerencia de Distribuci\u00f3n.<\/p>\n\n\n\n<p>Juan Abre\u00fa, supervisor de Aver\u00edas destac\u00f3 que \u201clos operarios de la estatal el\u00e9ctrica realizaron la instalaci\u00f3n de un tendido el\u00e9ctrico en media tensi\u00f3n 13.8 kV de 100 metros aproximadamente y la reubicaci\u00f3n de dos transformadores de 37.5 kVA, con el prop\u00f3sito de mejorar las condiciones del servicio el\u00e9ctrico en estas comunidades\u201d.<\/p>\n\n\n\n<p>Con estas acciones, Corpoelec contin\u00faa brindando atenci\u00f3n oportuna a los usuarios del sector el\u00e9ctrico de la entidad deltana.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Delta Amacuro.- En aras de fortalecer la continuidad del servicio el\u00e9ctrico en el estado Delta Amacuro, personal de la Corporaci\u00f3n<\/p>\n","protected":false},"author":24,"featured_media":92624,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30,7],"tags":[2691,2761,11,2744,46],"class_list":["post-92623","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","category-sen","tag-corpoelec","tag-delta-amacuro","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92623","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=92623"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92623\/revisions"}],"predecessor-version":[{"id":92625,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92623\/revisions\/92625"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/92624"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=92623"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=92623"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=92623"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}