{"id":92632,"date":"2024-11-21T19:39:24","date_gmt":"2024-11-21T19:39:24","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=92632"},"modified":"2024-11-21T19:39:26","modified_gmt":"2024-11-21T19:39:26","slug":"corpoelec-favorece-a-mas-de-77-mil-guariquenos-con-mantenimiento-a-subestacion-la-pascua","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=92632","title":{"rendered":"Corpoelec favorece a m\u00e1s de 77 mil guarique\u00f1os con mantenimiento a Subestaci\u00f3n La Pascua"},"content":{"rendered":"\n<p><strong>Estado Gu\u00e1rico.-<\/strong> La Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) realiz\u00f3 mantenimiento a la Subestaci\u00f3n La Pascua 115 kV, con el objetivo de optimizar la infraestructura y garantizar un servicio confiable a 77 mil 901 habitantes de los municipios Leonardo Infante, Chaguaramas, El Socorro, Jos\u00e9 F\u00e9lix Ribas y Juan Jos\u00e9 Rond\u00f3n del estado Gu\u00e1rico.<\/p>\n\n\n\n<p>Durante estas labores, se corrigieron puntos calientes asociados a las barras de 115\/13.8 y 34.5 kV, normalizaron las bancadas de cables de potencia y de control en los equipos de maniobra, a fin de contribuir a una mejor organizaci\u00f3n y sostenibilidad de los sistemas de energ\u00eda.<\/p>\n\n\n\n<p>Alfredo Orta, trabajador de la Corporaci\u00f3n, expres\u00f3 que \u00abpreviamente realizamos un estudio a la instalaci\u00f3n que nos permiti\u00f3 evaluar su rendimiento y abordar con estas labores que fortalecen el proceso de transmisi\u00f3n de energ\u00eda en la entidad llanera\u00bb.<\/p>\n\n\n\n<p>Estas acciones forman parte del compromiso continuo de Corpoelec para mantener y mejorar la infraestructura el\u00e9ctrica del pa\u00eds.<\/p>\n\n\n\n<p><strong>Prensa MPPEEC-Corpoelec<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Gu\u00e1rico.- La Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) realiz\u00f3 mantenimiento a la Subestaci\u00f3n La Pascua 115 kV, con el objetivo de<\/p>\n","protected":false},"author":24,"featured_media":92633,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30,7],"tags":[2691,2729,11,2744,46],"class_list":["post-92632","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","category-sen","tag-corpoelec","tag-guarico","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92632","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=92632"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92632\/revisions"}],"predecessor-version":[{"id":92634,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92632\/revisions\/92634"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/92633"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=92632"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=92632"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=92632"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}