{"id":92635,"date":"2024-11-21T19:46:56","date_gmt":"2024-11-21T19:46:56","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=92635"},"modified":"2024-11-21T19:46:58","modified_gmt":"2024-11-21T19:46:58","slug":"corpoelec-fortalece-servicio-electrico-en-beneficio-de-mas-de-13-mil-familias-araguenas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=92635","title":{"rendered":"Corpoelec fortalece servicio el\u00e9ctrico en beneficio de m\u00e1s de 13 mil familias arag\u00fce\u00f1as"},"content":{"rendered":"\n<p><strong>Estado Aragua.-<\/strong> En aras de favorecer a 13 mil 884 familias del sur de Maracay, la clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) en Aragua, realiz\u00f3 labores de mantenimiento correctivo en los circuitos La Punta, Los Samanes, San Carlos y Sur Autopista, en el marco del Plan de Soluciones de Restricciones Operativas de las redes de distribuci\u00f3n el\u00e9ctrica de la entidad central.<\/p>\n\n\n\n<p>Las labores contemplaron la ejecuci\u00f3n de obras civiles de los s\u00f3tanos de bancadas subterr\u00e1neas, instalaci\u00f3n de mil 392 metros de cables, reemplazo de doce seccionadores y aislamiento, sustituci\u00f3n de seis pararrayos, colocaci\u00f3n de conectores y herrajes requeridos, entre otros componentes.<\/p>\n\n\n\n<p>La construcci\u00f3n de la bancada subterr\u00e1nea, busca eliminar situaciones de riesgo y condiciones de los conductores de media tensi\u00f3n a\u00e9reos expuestos en el paso peatonal y vehicular, adem\u00e1s de permitir el seccionamiento ante eventuales aver\u00edas, facilitando la transferencia de carga y minimizando el impacto en la interrupci\u00f3n del servicio.<\/p>\n\n\n\n<p>Corpoelec avanza en el Plan de Soluciones de Restricciones Operativas, como parte del fortalecimiento del Sistema El\u00e9ctrico Nacional (SEN).<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Aragua.- En aras de favorecer a 13 mil 884 familias del sur de Maracay, la clase trabajadora de la<\/p>\n","protected":false},"author":24,"featured_media":92636,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30,7],"tags":[2708,2691,11,2744,46],"class_list":["post-92635","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","category-sen","tag-aragua","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92635","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=92635"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92635\/revisions"}],"predecessor-version":[{"id":92637,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92635\/revisions\/92637"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/92636"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=92635"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=92635"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=92635"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}