{"id":92643,"date":"2024-11-22T13:56:51","date_gmt":"2024-11-22T13:56:51","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=92643"},"modified":"2024-11-22T13:56:53","modified_gmt":"2024-11-22T13:56:53","slug":"corpoelec-instalo-mas-de-750-transformadores-en-el-estado-bolivar","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=92643","title":{"rendered":"Corpoelec instal\u00f3 m\u00e1s de 750 transformadores en el estado Bol\u00edvar"},"content":{"rendered":"\n<p><strong>Estado Bol\u00edvar.-<\/strong> Durante el 2024, los trabajadores de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) instalaron un total de 759 transformadores en el estado Bol\u00edvar, para el beneficio de diferentes sectores de las 11 parroquias que conforman la entidad.<\/p>\n\n\n\n<p>A trav\u00e9s del Sistema 1&#215;10 del Buen Gobierno, la clase trabajadora de Corpoelec ha sumado esfuerzos para atender oportuna y eficazmente a las comunidades del territorio bolivarense.<\/p>\n\n\n\n<p>Entre las maniobras realizadas por las cuadrillas de la Gerencia de Distribuci\u00f3n, se incluyeron la puesta en servicio de equipos de potencia de diferentes capacidades de 25 kVA , 37.5 kVA, 50 kVA y 100 kVA .<\/p>\n\n\n\n<p>Estos transformadores fueron instalados en diversas zonas del estado Bol\u00edvar, a fin de garantizar la continuidad del suministro el\u00e9ctrico a m\u00e1s de 2 millones de habitantes.<\/p>\n\n\n\n<p>Corpoelec ratifica su compromiso de robustecer el sistema el\u00e9ctrico brindado a las familias venezolanas.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Bol\u00edvar.- Durante el 2024, los trabajadores de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) instalaron un total de 759 transformadores en<\/p>\n","protected":false},"author":24,"featured_media":92644,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30,7],"tags":[2723,2691,11,2744,46],"class_list":["post-92643","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","category-sen","tag-bolivar","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92643","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=92643"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92643\/revisions"}],"predecessor-version":[{"id":92645,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/92643\/revisions\/92645"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/92644"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=92643"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=92643"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=92643"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}