{"id":93027,"date":"2024-12-11T18:31:42","date_gmt":"2024-12-11T18:31:42","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=93027"},"modified":"2024-12-11T18:31:43","modified_gmt":"2024-12-11T18:31:43","slug":"mantenimiento-preventivo-anual-garantiza-suministro-electrico-a-mas-de-670-mil-apurenos","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=93027","title":{"rendered":"Mantenimiento preventivo anual garantiza suministro el\u00e9ctrico a m\u00e1s de 670 mil apure\u00f1os"},"content":{"rendered":"\n<p class=\"has-text-align-left\"><strong>Estado Apure.-<\/strong> Con el objetivo de optimizar el servicio el\u00e9ctrico, la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), ejecut\u00f3 durante el a\u00f1o 2024, un total de 190 tareas de mantenimiento en las cinco subestaciones de transmisi\u00f3n del estado Apure, beneficiando a m\u00e1s de 670 mil habitantes.<\/p>\n\n\n\n<p class=\"has-text-align-left\">Las labores desarrolladas en 2024, incluyen: pruebas termogr\u00e1ficas, ajustes de conexiones, lubricaci\u00f3n de equipos, limpieza de componentes y otras acciones para prolongar la vida \u00fatil de las instalaciones. Gracias a estas medidas, se garantiza un suministro de energ\u00eda confiable y de calidad para todos los usuarios.<\/p>\n\n\n\n<p class=\"has-text-align-left\">Antonio Orta, trabajador de la Gerencia de Transmisi\u00f3n de Corpoelec en Apure, destac\u00f3 la importancia de estas jornadas para mantener las subestaciones en \u00f3ptimas condiciones y brindar bienestar a las comunidades.<\/p>\n\n\n\n<p class=\"has-text-align-left\">Estas acciones forman parte del Plan de Mantenimiento Anual que impulsa el Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE), a trav\u00e9s de Corpoelec.<\/p>\n\n\n\n<p class=\"has-text-align-left\"><strong>Prensa MPPEE\/Corpoelec.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Apure.- Con el objetivo de optimizar el servicio el\u00e9ctrico, la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), ejecut\u00f3 durante el a\u00f1o 2024,<\/p>\n","protected":false},"author":24,"featured_media":93028,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30,7],"tags":[2722,2691,11,2744,46],"class_list":["post-93027","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","category-sen","tag-apure","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93027","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=93027"}],"version-history":[{"count":2,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93027\/revisions"}],"predecessor-version":[{"id":93030,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93027\/revisions\/93030"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/93028"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=93027"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=93027"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=93027"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}