{"id":93057,"date":"2024-12-12T16:25:09","date_gmt":"2024-12-12T16:25:09","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=93057"},"modified":"2024-12-12T16:25:11","modified_gmt":"2024-12-12T16:25:11","slug":"corpoelec-instalo-transformadores-para-favorecer-a-mas-de-10-mil-personas-en-lara","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=93057","title":{"rendered":"Corpoelec instal\u00f3 transformadores para favorecer a m\u00e1s de 10 mil personas en Lara"},"content":{"rendered":"\n<p><strong>Estado Lara.- <\/strong>A trav\u00e9s del Plan de Sustituci\u00f3n de Transformadores de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) se concret\u00f3 la instalaci\u00f3n de 52 transformadores en diversos sectores y comunidades del estado Lara.<\/p>\n\n\n\n<p>Estos trabajos responden a los casos registrados en la plataforma tecnol\u00f3gica VenApp durante el mes de noviembre, por m\u00e1s de 10 mil personas residenciadas en las parroquias: Moroturo, Siquisique, Freites, Jos\u00e9 Mar\u00eda Blanco, Trinidad Samuel, Espinosa de los Monteros, El Blanco y Casta\u00f1eda de los municipios Urdaneta, Crespo y Torres.<\/p>\n\n\n\n<p>Asimismo, la instalaci\u00f3n de nuevos equipos potenci\u00f3 la distribuci\u00f3n el\u00e9ctrica en las parroquias: Bol\u00edvar, Tintorero, Diego de Lozada, Juan Bautista Rodr\u00edguez, Gustavo Vegas Le\u00f3n, Cabudare, Jos\u00e9 Gregorio Bastidas, Aguedo Felipe Alvarado, Catedral, Ana Soto, Concepci\u00f3n, Santa Rosa, Uni\u00f3n y Tamaca de los municipios, Mor\u00e1n, Jim\u00e9nez, Sim\u00f3n Planas, Palavecino e Iribarren.<\/p>\n\n\n\n<p>Cabe destacar que, adicionalmente la clase trabajadora de la estatal el\u00e9ctrica realiz\u00f3 inspecciones, mantenimiento y adecuaciones en media y baja tensi\u00f3n, en atenci\u00f3n al mecanismo electr\u00f3nico del 1\u00d710 del Buen Gobierno que atiende por el sector el\u00e9ctrico, el Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE) y Corpoelec a escala nacional.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Lara.- A trav\u00e9s del Plan de Sustituci\u00f3n de Transformadores de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) se concret\u00f3 la instalaci\u00f3n<\/p>\n","protected":false},"author":22,"featured_media":93058,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30,7],"tags":[2691,11,2744,46],"class_list":["post-93057","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","category-sen","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93057","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=93057"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93057\/revisions"}],"predecessor-version":[{"id":93059,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93057\/revisions\/93059"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/93058"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=93057"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=93057"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=93057"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}