{"id":93082,"date":"2024-12-13T14:25:58","date_gmt":"2024-12-13T14:25:58","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=93082"},"modified":"2024-12-13T14:26:00","modified_gmt":"2024-12-13T14:26:00","slug":"corpoelec-realiza-mantenimiento-integral-a-subestacion-bocono-en-tachira","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=93082","title":{"rendered":"Corpoelec realiza mantenimiento integral a subestaci\u00f3n Bocon\u00f3 en T\u00e1chira"},"content":{"rendered":"\n<p><strong>Estado T\u00e1chira.-<\/strong> Con miras a seguir potenciando la operatividad del Sistema El\u00e9ctrico Nacional (SEN), la clase obrera de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), realiz\u00f3 mantenimiento integral a la subestaci\u00f3n Bocon\u00f3 34,5\/13,8 kV, para fortalecer el suministro de electricidad en el estado T\u00e1chira.<\/p>\n\n\n\n<p>El mantenimiento incluy\u00f3 la instalaci\u00f3n de conectores y abrazaderas a la salida del circuito Bocon\u00f3 y, la programaci\u00f3n de los equipos con sus protecciones, llevando a cabo pruebas mec\u00e1nicas y el\u00e9ctricas para verificar el estado de los transformadores y otros equipos.<\/p>\n\n\n\n<p>Con estos trabajos Corpoelec, potencia la calidad y eficiencia operativa de esta subestaci\u00f3n que suministra energ\u00eda el\u00e9ctrica a 16 mil usuarios de la entidad tachirense, contribuyendo al desarrollo y bienestar de la comunidad, proporcionando un servicio m\u00e1s seguro y confiable para todos los usuarios.<\/p>\n\n\n\n<p><strong>Prensa MPPEE\/Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado T\u00e1chira.- Con miras a seguir potenciando la operatividad del Sistema El\u00e9ctrico Nacional (SEN), la clase obrera de la Corporaci\u00f3n<\/p>\n","protected":false},"author":22,"featured_media":93083,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30,7],"tags":[2691,11,2744,2700,46],"class_list":["post-93082","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","category-sen","tag-corpoelec","tag-mppee","tag-sen","tag-tachira","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93082","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=93082"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93082\/revisions"}],"predecessor-version":[{"id":93084,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93082\/revisions\/93084"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/93083"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=93082"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=93082"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=93082"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}