{"id":93093,"date":"2024-12-13T14:35:38","date_gmt":"2024-12-13T14:35:38","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=93093"},"modified":"2024-12-13T14:35:40","modified_gmt":"2024-12-13T14:35:40","slug":"mas-de-600-familias-del-eje-sur-aragueno-son-beneficiadas-con-mejoras-integrales-a-la-red-electrica","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=93093","title":{"rendered":"M\u00e1s de 600 familias del eje sur arag\u00fce\u00f1o son beneficiadas con mejoras integrales a la red el\u00e9ctrica"},"content":{"rendered":"\n<p><strong>Estado Aragua.-<\/strong> Durante dos d\u00edas continuos, la clase obrera de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), cumpli\u00f3 labores preventivas y correctivas en las redes el\u00e9ctricas de media y baja tensi\u00f3n, en m\u00e1s de 15 sectores de los municipios Camatagua y San Casimiro, ubicados en el eje sur del estado Aragua.<\/p>\n\n\n\n<p>Con estas labores se atendi\u00f3 el circuito Valle Mor\u00edn, y se realiz\u00f3 la sustituci\u00f3n de 50 componentes, ajustes y reparaciones en la derivaci\u00f3n de M\u00facura-Zuata y en el sector La Perolera, Primer Cerro, El Lim\u00f3n, Las Marquesinas y Delicias Deucura, entre otros.<\/p>\n\n\n\n<p>Durante los trabajos se instal\u00f3 un transformador en el Simoncito de la localidad, donde funciona el Infocentro de Camatagua, e igualmente se instalaron 140 luminarias tipo LED en distintas localidades.<\/p>\n\n\n\n<p>Adicionalmente, con el Plan Pica y Poda, se despejaron 14 kil\u00f3metros de vegetaci\u00f3n sobre las redes de media tensi\u00f3n, impactando a m\u00e1s de 15 sectores.<\/p>\n\n\n\n<p>Esta atenci\u00f3n integral forma parte del Plan de Soluciones Operativas de las redes de distribuci\u00f3n el\u00e9ctrica, para seguir fortaleciendo el Sistema El\u00e9ctrico Nacional (SEN), y con un servicio el\u00e9ctrico de calidad a m\u00e1s de 600 familias de Aragua.<\/p>\n\n\n\n<p><strong>Prensa MPPEE\/Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Aragua.- Durante dos d\u00edas continuos, la clase obrera de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), cumpli\u00f3 labores preventivas y correctivas<\/p>\n","protected":false},"author":22,"featured_media":93094,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30,7],"tags":[2708,2691,11,2744,46],"class_list":["post-93093","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","category-sen","tag-aragua","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93093","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=93093"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93093\/revisions"}],"predecessor-version":[{"id":93095,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93093\/revisions\/93095"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/93094"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=93093"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=93093"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=93093"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}