{"id":93115,"date":"2024-12-14T15:06:30","date_gmt":"2024-12-14T15:06:30","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=93115"},"modified":"2024-12-14T15:06:32","modified_gmt":"2024-12-14T15:06:32","slug":"corpoelec-fortalece-con-mantenimiento-preventivo-la-linea-tigre-san-geronimo-a-en-guarico","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=93115","title":{"rendered":"Corpoelec fortalece con mantenimiento preventivo la l\u00ednea Tigre &#8211; San Ger\u00f3nimo A en Gu\u00e1rico"},"content":{"rendered":"\n<p><strong>Estado Gu\u00e1rico.- <\/strong>La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), realiz\u00f3 mantenimiento preventivo en la l\u00ednea de transmisi\u00f3n El Tigre &#8211; San Ger\u00f3nimo A II, de 400 kV, con el objetivo de optimizar el proceso de transmisi\u00f3n de energ\u00eda en los estados Gu\u00e1rico y Anzo\u00e1tegui.<\/p>\n\n\n\n<p>Las maniobras contemplaron la sustituci\u00f3n de cadena de aisladores espec\u00edficamente en las torres 381, 383, 385 y 386, adem\u00e1s de ajustes de conexiones que aseguran el funcionamiento de esta red de alta tensi\u00f3n.<\/p>\n\n\n\n<p>Estas labores fueron planificadas por el personal de L\u00edneas Troncales, luego de inspeccionar previamente punto a punto esta importante l\u00ednea que conecta el oriente con la entidad llanera.<\/p>\n\n\n\n<p>De esta manera, los trabajadores de Corpoelec materializan el Plan Integral de Mantenimiento Preventivo, en aras de fortalecer la infraestructura el\u00e9ctrica del pa\u00eds, en garant\u00eda de un servicio confiable que brinde bienestar a la poblaci\u00f3n venezolana.<\/p>\n\n\n\n<p><strong>Prensa MPPEE\/Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Gu\u00e1rico.- La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), realiz\u00f3 mantenimiento preventivo en la l\u00ednea de transmisi\u00f3n El<\/p>\n","protected":false},"author":22,"featured_media":93116,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30,7],"tags":[2691,2729,11,2744,46],"class_list":["post-93115","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","category-sen","tag-corpoelec","tag-guarico","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93115","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=93115"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93115\/revisions"}],"predecessor-version":[{"id":93117,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93115\/revisions\/93117"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/93116"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=93115"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=93115"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=93115"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}