{"id":93139,"date":"2024-12-16T20:01:08","date_gmt":"2024-12-16T20:01:08","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=93139"},"modified":"2024-12-16T20:01:11","modified_gmt":"2024-12-16T20:01:11","slug":"corpoelec-fortalece-el-sistema-de-distribucion-para-mas-de-30-mil-usuarios-de-cabimas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=93139","title":{"rendered":"Corpoelec fortalece el sistema de distribuci\u00f3n para m\u00e1s de 30 mil usuarios de Cabimas"},"content":{"rendered":"\n<p><strong>Estado Zulia.-<\/strong> Para la continuidad del servicio el\u00e9ctrico, las cuadrillas de la Gerencia de Distribuci\u00f3n de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), en el municipio Cabimas del estado Zulia, realizaron mejoras en las l\u00edneas de distribuci\u00f3n, beneficiando a m\u00e1s de 31 mil usuarios.<\/p>\n\n\n\n<p>Los trabajos comprendieron el reemplazo de cortadores, permagrip y fusiles de diferentes amperios, atendiendo a los circuitos: Simon Bol\u00edvar, Liceo Militar, Costa Mall, Despacho, Los Laureles, Oro Negro, Brisas del Lago, Carretera J, Cl\u00ednica Bello Monte, Reten y Andes.<\/p>\n\n\n\n<p>La atenci\u00f3n en materia el\u00e9ctrica contempl\u00f3 el diagn\u00f3stico y evaluaci\u00f3n de las l\u00edneas de distribuci\u00f3n, para mejorar las operaciones ratificando el compromiso de garantizar la continuidad del servicio el\u00e9ctrico y el fortalecimiento del sistema de distribuci\u00f3n en el municipio Cabimas.<\/p>\n\n\n\n<p><strong>Prensa MPPEE\/Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Zulia.- Para la continuidad del servicio el\u00e9ctrico, las cuadrillas de la Gerencia de Distribuci\u00f3n de la Corporaci\u00f3n El\u00e9ctrica Nacional<\/p>\n","protected":false},"author":22,"featured_media":93140,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30,7],"tags":[2691,11,2744,46,2694],"class_list":["post-93139","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","category-sen","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela","tag-zulia"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93139","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=93139"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93139\/revisions"}],"predecessor-version":[{"id":93141,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93139\/revisions\/93141"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/93140"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=93139"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=93139"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=93139"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}