{"id":93145,"date":"2024-12-16T20:12:52","date_gmt":"2024-12-16T20:12:52","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=93145"},"modified":"2024-12-16T20:12:53","modified_gmt":"2024-12-16T20:12:53","slug":"instalan-interruptor-para-optimizar-el-suministro-electrico-en-cojedes-y-barinas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=93145","title":{"rendered":"Instalan interruptor para optimizar el suministro el\u00e9ctrico en Cojedes y Barinas"},"content":{"rendered":"\n<p><strong>Los Llanos.- <\/strong>Con el fin de fortalecer los sistemas de transmisi\u00f3n y distribuci\u00f3n de energ\u00eda en los estados Cojedes y Barinas, el personal especializado de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), instal\u00f3 un interruptor de alta tecnolog\u00eda en la Subestaci\u00f3n San Carlos 115 Kv.<\/p>\n\n\n\n<p>Con la puesta en marcha de este equipo, se consolida un modo de respuesta m\u00e1s efectiva ante cualquier eventualidad y se favorecen en mejoras del servicio a m\u00e1s de 40 mil usuarios de los municipios llaneros Pao de San Juan Bautista, Girardot y Arismendi.<\/p>\n\n\n\n<p>Estas labores permiten fortalecer la infraestructura y el suministro de energ\u00eda a trav\u00e9s de la barra de transferencia e incrementan la flexibilidad de la red el\u00e9ctrica para los circuitos Pao y Tirado.<\/p>\n\n\n\n<p>De esta manera, el Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE) y Corpoelec contin\u00faan trabajando en el acondicionamiento del Sistema El\u00e9ctrico Nacional (SEN) con obras que garantizan el desarrollo eficaz de las actividades diarias del sector.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Los Llanos.- Con el fin de fortalecer los sistemas de transmisi\u00f3n y distribuci\u00f3n de energ\u00eda en los estados Cojedes y<\/p>\n","protected":false},"author":22,"featured_media":93146,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30,7],"tags":[2691,2707,11,2744,46],"class_list":["post-93145","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","category-sen","tag-corpoelec","tag-los-llanos","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93145","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=93145"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93145\/revisions"}],"predecessor-version":[{"id":93147,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93145\/revisions\/93147"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/93146"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=93145"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=93145"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=93145"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}