{"id":93209,"date":"2024-12-20T09:00:00","date_gmt":"2024-12-20T09:00:00","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=93209"},"modified":"2024-12-26T16:33:46","modified_gmt":"2024-12-26T16:33:46","slug":"amplian-capacidad-de-suministro-en-seis-circuitos-del-municipio-cristobal-rojas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=93209","title":{"rendered":"Ampl\u00edan capacidad de suministro en seis circuitos del municipio Crist\u00f3bal Rojas"},"content":{"rendered":"\n<p><strong>Estado Miranda.-<\/strong> Las cuadrillas centinelas de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), sustituyeron un transformador de potencia en la subestaci\u00f3n Alvarenga 115\/13,8 kV, que atiende seis circuitos del municipio Crist\u00f3bal Rojas del estado Miranda.<\/p>\n\n\n\n<p>El equipo potenciado est\u00e1 asociado a la salida de la l\u00ednea Charallave II a 115 kV, donde se efectuaron trabajos t\u00e9cnicos con apoyo del personal operativo de Miranda y Distrito Capital para armar, conectar y ajustar piezas para la instalaci\u00f3n del transformador y verificaci\u00f3n.<\/p>\n\n\n\n<p>Con el desarrollo de estas actividades, se mejoran los niveles de tensi\u00f3n de los circuitos Alvarenga, Campito, Olivo, Estrella, Magdalena y San Rafael, gracias al compromiso y entrega de la clase trabajadora en pro de brindar un servicio eficiente y de calidad a los usuarios.<\/p>\n\n\n\n<p>Adem\u00e1s, se extienden las capacidades de suministro del servicio el\u00e9ctrico para m\u00e1s de 33 mil 200 usuarios de la regi\u00f3n mirandina.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- Las cuadrillas centinelas de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), sustituyeron un transformador de potencia en la subestaci\u00f3n Alvarenga<\/p>\n","protected":false},"author":24,"featured_media":93210,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30,7],"tags":[2691,2709,11,2744,46],"class_list":["post-93209","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","category-sen","tag-corpoelec","tag-miranda","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93209","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=93209"}],"version-history":[{"count":2,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93209\/revisions"}],"predecessor-version":[{"id":93373,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93209\/revisions\/93373"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/93210"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=93209"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=93209"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=93209"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}