{"id":93325,"date":"2024-12-23T20:30:39","date_gmt":"2024-12-23T20:30:39","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=93325"},"modified":"2024-12-23T20:30:41","modified_gmt":"2024-12-23T20:30:41","slug":"instalacion-de-transformadores-robustece-servicio-brindado-a-mas-de-4-mil-familias-cojedenas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=93325","title":{"rendered":"Instalaci\u00f3n de transformadores robustece servicio brindado a m\u00e1s de 4 mil familias cojede\u00f1as"},"content":{"rendered":"\n<p><strong>Estado Cojedes.-<\/strong> Con el prop\u00f3sito de asegurar un servicio el\u00e9ctrico continuo y confiable, la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) instal\u00f3 216 transformadores de diferentes capacidades en el estado Cojedes, atendiendo as\u00ed las solicitudes de 4.320 familias.<\/p>\n\n\n\n<p>El personal especializado se despleg\u00f3 por sectores de los municipios Tinaquillo, Tinaco, Ezequiel Zamora, Girardot, Pao de San Juan Bautista, Lima Blanco, Ricaurte y Anzo\u00e1tegui para dar respuesta efectiva a los reportes generados a trav\u00e9s de la VenApp del 1&#215;10 del Buen Gobierno.<\/p>\n\n\n\n<p>La puesta en marcha de los nuevos equipos de potencia permite optimizar los niveles de tensi\u00f3n y fortalecer la red de distribuci\u00f3n en cada una de las zonas atendidas. Sobre esto, Pedro Regalado, residente de San Carlos, se\u00f1al\u00f3 sentirse agradecido \u00abpor la buena gesti\u00f3n y r\u00e1pida respuesta que recibimos\u00bb por parte de los trabajadores de la estatal el\u00e9ctrica.<\/p>\n\n\n\n<p>De esta manera, Corpoelec ratifica su compromiso de impulsar las pol\u00edticas p\u00fablicas emanadas por el presidente Nicol\u00e1s Maduro y el Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE) en pro de la estabilidad del pueblo venezolano.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Cojedes.- Con el prop\u00f3sito de asegurar un servicio el\u00e9ctrico continuo y confiable, la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) instal\u00f3 216<\/p>\n","protected":false},"author":24,"featured_media":93327,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30],"tags":[2688,2710,2752,2751],"class_list":["post-93325","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","tag-1x10-del-buen-gobierno","tag-cojedes","tag-servicio","tag-transformadores"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93325","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=93325"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93325\/revisions"}],"predecessor-version":[{"id":93328,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93325\/revisions\/93328"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/93327"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=93325"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=93325"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=93325"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}