{"id":93417,"date":"2024-12-28T12:00:00","date_gmt":"2024-12-28T12:00:00","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=93417"},"modified":"2024-12-28T14:14:57","modified_gmt":"2024-12-28T14:14:57","slug":"atendidas-a-traves-del-plan-pica-y-poda-17-instalaciones-electricas-en-zulia","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=93417","title":{"rendered":"Atendidas 17 instalaciones el\u00e9ctricas en Zulia a trav\u00e9s del Plan Pica y Poda"},"content":{"rendered":"\n<p><strong>Estado Zulia.-<\/strong> A trav\u00e9s del Plan Pica y Poda, la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) desmalez\u00f3 93 hect\u00e1reas para garantizar la operatividad de 17 instalaciones el\u00e9ctricas del estado Zulia.<\/p>\n\n\n\n<p>Estas acciones que tambi\u00e9n tributan al Plan de Mantenimiento de Instalaciones El\u00e9ctricas, contemplaron la atenci\u00f3n de 14 subestaciones y tres plantas de generaci\u00f3n ubicadas en los municipios Maracaibo, Col\u00f3n, Lagunillas, La Ca\u00f1ada de Urdaneta, Baralt, Valmore Rodr\u00edguez y Cabimas.<\/p>\n\n\n\n<p>Las labores apuntan a garantizar la operatividad del Sistema El\u00e9ctrico Nacional (SEN) para contribuir de manera eficiente con la continuidad del servicio el\u00e9ctrico en la entidad zuliana.<\/p>\n\n\n\n<p>De esta manera, se cumplen a cabalidad las estrategias del Gobierno Nacional, ejecutadas a trav\u00e9s del Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE) y Corpoelec.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Zulia.- A trav\u00e9s del Plan Pica y Poda, la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) desmalez\u00f3 93 hect\u00e1reas para garantizar la<\/p>\n","protected":false},"author":24,"featured_media":93418,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30,7],"tags":[2691,2816,2694],"class_list":["post-93417","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","category-sen","tag-corpoelec","tag-pica-y-poda","tag-zulia"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93417","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=93417"}],"version-history":[{"count":3,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93417\/revisions"}],"predecessor-version":[{"id":93432,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93417\/revisions\/93432"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/93418"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=93417"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=93417"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=93417"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}