{"id":93459,"date":"2024-12-28T20:30:56","date_gmt":"2024-12-28T20:30:56","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=93459"},"modified":"2024-12-28T20:30:58","modified_gmt":"2024-12-28T20:30:58","slug":"supervisan-avances-de-unidades-tz05-y-tz11-en-termozulia","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=93459","title":{"rendered":"Supervisan avances de unidades TZ05 y TZ11 en Termozulia"},"content":{"rendered":"\n<p><strong>Estado Zulia.- <\/strong>A trav\u00e9s de un recorrido a las instalaciones del Complejo Termoel\u00e9ctrico G\/J Rafael Urdaneta, ubicado en el municipio La Ca\u00f1ada de Urdaneta del estado Zulia, el ministro del Poder Popular para la Energ\u00eda El\u00e9ctrica, Jorge M\u00e1rquez, constat\u00f3 los avances de las maniobras de rehabilitaci\u00f3n que se realizan en el contexto del Plan Nacional de Inspecciones y Mantenimiento Integral al Sistema El\u00e9ctrico Nacional (SEN).<\/p>\n\n\n\n<p>En compa\u00f1\u00eda de trabajadores y trabajadoras de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), evalu\u00f3 las labores ejecutadas en las unidades TZ05 y TZ11, proceso que fortalecer\u00e1 la generaci\u00f3n en la entidad occidental.<\/p>\n\n\n\n<p>Como ya es habitual en sus visitas a infraestructuras el\u00e9ctricas, M\u00e1rquez extendi\u00f3 sus palabras de reconocimiento a la clase obrera que, sin descanso, contin\u00faa desplegada para elevar la capacidad de generaci\u00f3n, transmisi\u00f3n y distribuci\u00f3n de la energ\u00eda a favor del pueblo venezolano.<\/p>\n\n\n\n<p>Estas acciones se desarrollan en consonancia con las estrategias trazadas por el presidente de la Rep\u00fablica, Nicol\u00e1s Maduro, quien ha instruido la recuperaci\u00f3n plena de las instalaciones el\u00e9ctricas para garantizar la eficiencia del servicio el\u00e9ctrico.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Zulia.- A trav\u00e9s de un recorrido a las instalaciones del Complejo Termoel\u00e9ctrico G\/J Rafael Urdaneta, ubicado en el municipio<\/p>\n","protected":false},"author":24,"featured_media":93461,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,15,7],"tags":[2908,2909,2763,2704,2907,2906,2694],"class_list":["post-93459","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-nacionales","category-sen","tag-complejo-termoelectrico","tag-inspeccion","tag-jorge-marquez","tag-mantenimiento","tag-rafael-urdaneta","tag-termozulia","tag-zulia"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93459","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=93459"}],"version-history":[{"count":2,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93459\/revisions"}],"predecessor-version":[{"id":93462,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93459\/revisions\/93462"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/93461"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=93459"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=93459"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=93459"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}