{"id":93560,"date":"2025-01-07T13:38:20","date_gmt":"2025-01-07T13:38:20","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=93560"},"modified":"2025-01-07T13:38:22","modified_gmt":"2025-01-07T13:38:22","slug":"nuevo-interruptor-potencia-la-linea-115-kv-paez-merida-ii","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=93560","title":{"rendered":"Nuevo interruptor potencia la l\u00ednea 115 kV P\u00e1ez \u2013 M\u00e9rida II"},"content":{"rendered":"\n<p><strong>Estado Barinas.-\u00a0<\/strong>En la Subestaci\u00f3n P\u00e1ez 115 kV, ubicada en el estado Barinas, la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) reemplaz\u00f3 un interruptor asociado a la l\u00ednea M\u00e9rida II, con el prop\u00f3sito de optimizar el servicio de energ\u00eda a m\u00e1s de 900 mil meride\u00f1os.<\/p>\n\n\n\n<p>El nuevo equipo de potencia, permite modernizar y mejorar el sistema de transmisi\u00f3n en la red de alta tensi\u00f3n.<\/p>\n\n\n\n<p>Las labores ejecutadas en esta infraestructura del piedemonte andino, tambi\u00e9n contemplaron la adecuaci\u00f3n y reemplazo de conductores, ajustes de dispositivos, correcci\u00f3n de puntos calientes y mejoras en los componentes.<\/p>\n\n\n\n<p>Javier Brice\u00f1o, trabajador de la Gerencia de Transmisi\u00f3n Barinas, mencion\u00f3 que estas maniobras se efect\u00faan con el objetivo de brindar bienestar a la poblaci\u00f3n<\/p>\n\n\n\n<p>\u201cEstamos comprometidos en potenciar el sistema interconectado del pa\u00eds y estas maniobras nos permiten acercarnos al objetivo\u201d, enfatiz\u00f3 Brice\u00f1o.<\/p>\n\n\n\n<p>El Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica a trav\u00e9s de Corpoelec avanza en la consolidaci\u00f3n de labores que\u00a0 potencian la transmisi\u00f3n del fluido el\u00e9ctrico en el territorio venezolano.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Barinas.-\u00a0En la Subestaci\u00f3n P\u00e1ez 115 kV, ubicada en el estado Barinas, la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) reemplaz\u00f3 un interruptor<\/p>\n","protected":false},"author":22,"featured_media":93561,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30,7],"tags":[2698,2691,11,2744,46],"class_list":["post-93560","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","category-sen","tag-barinas","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93560","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=93560"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93560\/revisions"}],"predecessor-version":[{"id":93562,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93560\/revisions\/93562"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/93561"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=93560"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=93560"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=93560"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}