{"id":93568,"date":"2025-01-07T13:52:32","date_gmt":"2025-01-07T13:52:32","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=93568"},"modified":"2025-01-07T13:55:00","modified_gmt":"2025-01-07T13:55:00","slug":"mas-de-2-mil-kilometros-de-corredores-electricos-en-lara-fueron-atendidos-con-el-plan-pica-y-poda","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=93568","title":{"rendered":"M\u00e1s de 2 mil kil\u00f3metros de corredores el\u00e9ctricos en Lara fueron atendidos con el Plan Pica y Poda"},"content":{"rendered":"\n<p><strong>Estado Lara.-<\/strong> Con el prop\u00f3sito de optimizar la distribuci\u00f3n del servicio el\u00e9ctrico, trabajadores de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) atendieron con labores de pica y poda, durante el a\u00f1o 2024, 2 mil 414 kil\u00f3metros de corredores de l\u00edneas en baja, media y alta tensi\u00f3n en el estado Lara.<\/p>\n\n\n\n<p>Las maniobras desarrolladas por las cuadrillas operativas de las gerencias de Programaci\u00f3n y Control de Vegetaci\u00f3n, conjuntamente con Distribuci\u00f3n, comprendieron el corte selectivo de \u00e1rboles y despeje de vegetaci\u00f3n cercana al tendido el\u00e9ctrico en la regi\u00f3n.<\/p>\n\n\n\n<p>La programaci\u00f3n de mantenimiento abarc\u00f3 47 circuitos de distribuci\u00f3n asociados a 29 subestaciones el\u00e9ctricas y se aplic\u00f3 de manera continua en la geograf\u00eda de los municipios: Mor\u00e1n, Jim\u00e9nez, Andr\u00e9s Eloy Blanco, Torres, Urdaneta, Crespo, Sim\u00f3n Planas, Palavecino e Iribarren.<\/p>\n\n\n\n<p>Con estas acciones, en el contexto del Plan Pica y Poda, la estatal el\u00e9ctrica avanza trabajando de forma permanente a fin de alcanzar la estabilizaci\u00f3n y consolidaci\u00f3n del Sistema El\u00e9ctrico Nacional (SEN), para el buen vivir del pueblo venezolano.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Lara.- Con el prop\u00f3sito de optimizar la distribuci\u00f3n del servicio el\u00e9ctrico, trabajadores de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) atendieron<\/p>\n","protected":false},"author":22,"featured_media":93572,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30,7],"tags":[2691,2690,11,2744,46],"class_list":["post-93568","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","category-sen","tag-corpoelec","tag-lara","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93568","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=93568"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93568\/revisions"}],"predecessor-version":[{"id":93570,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93568\/revisions\/93570"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/93572"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=93568"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=93568"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=93568"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}