{"id":93983,"date":"2025-01-22T19:40:27","date_gmt":"2025-01-22T19:40:27","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=93983"},"modified":"2025-01-22T19:40:28","modified_gmt":"2025-01-22T19:40:28","slug":"mas-de-8-mil-trujillanos-favorecidos-con-labores-mantenimiento-en-subestaciones-electricas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=93983","title":{"rendered":"M\u00e1s de 8 mil trujillanos favorecidos con labores mantenimiento en subestaciones el\u00e9ctricas"},"content":{"rendered":"\n<p><strong>Estado Trujillo.- <\/strong>Con el objetivo de contribuir en la estabilizaci\u00f3n del sistema el\u00e9ctrico en la regi\u00f3n trujillana, trabajadores de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), ejecutaron mantenimiento preventivo y correctivo en subestaciones el\u00e9ctricas de distribuci\u00f3n de 34.5 y 13.8kV.<\/p>\n\n\n\n<p>Durante la jornada, la cuadrilla especializada efectu\u00f3 las maniobras correspondientes de mantenimiento en 12 instalaciones el\u00e9ctricas: La Puerta, Timotes, Jaj\u00f3, La Concepci\u00f3n, Carache, El Jag\u00fcito, Sabana de Mendoza, Valle Verde, Agua Santa, Arapuey, Isnot\u00fa y San Antonio.<\/p>\n\n\n\n<p>Las labores consistieron en la correcci\u00f3n de puntos calientes, instalaci\u00f3n de pararrayos, termovisi\u00f3n, reparaci\u00f3n de seccionadores, ajuste y reemplazo de conectores, garantizando el buen funcionamiento de los equipos el\u00e9ctricos de potencia y prestar un servicio confiable a m\u00e1s de 8 mil trujillanos.<\/p>\n\n\n\n<p>Corpoelec reafirma el compromiso de brindar un servicio confiable y eficiente, cumpliendo firmemente con Los lineamientos del Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE).<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Trujillo.- Con el objetivo de contribuir en la estabilizaci\u00f3n del sistema el\u00e9ctrico en la regi\u00f3n trujillana, trabajadores de la<\/p>\n","protected":false},"author":24,"featured_media":93984,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30,7],"tags":[2691,11,2744,2702,46],"class_list":["post-93983","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","category-sen","tag-corpoelec","tag-mppee","tag-sen","tag-trujillo","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93983","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=93983"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93983\/revisions"}],"predecessor-version":[{"id":93985,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/93983\/revisions\/93985"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/93984"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=93983"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=93983"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=93983"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}