{"id":94000,"date":"2025-01-24T18:22:06","date_gmt":"2025-01-24T18:22:06","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=94000"},"modified":"2025-01-24T18:22:07","modified_gmt":"2025-01-24T18:22:07","slug":"inicia-plan-especial-de-inspeccion-a-subestaciones-electricas-en-anzoategui","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=94000","title":{"rendered":"Inicia plan especial de inspecci\u00f3n a subestaciones el\u00e9ctricas en Anzo\u00e1tegui"},"content":{"rendered":"\n<p><strong>Estado Anzo\u00e1tegui.-<\/strong> 57 subestaciones el\u00e9ctricas de las \u00e1reas de transmisi\u00f3n, distribuci\u00f3n y generaci\u00f3n en el estado Anzo\u00e1tegui ser\u00e1n inspeccionadas durante el primer trimestre del a\u00f1o 2025, como parte de los planes y proyectos que impulsa la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) para garantizar la estabilidad y confiabilidad del suministro el\u00e9ctrico al pueblo anzoatiguense.<\/p>\n\n\n\n<p>El plan inici\u00f3 este martes 20 de enero, con la inspecci\u00f3n a la subestaci\u00f3n Tapas Corona, ubicada en el municipio Sim\u00f3n Bol\u00edvar por parte de la gerencia de Bienes y Servicios y El Rinc\u00f3n, en el municipio Sotillo por Asesor\u00eda Legal.<\/p>\n\n\n\n<p>Las inspecciones culminar\u00e1n, seg\u00fan el cronograma el pr\u00f3ximo 17 de marzo, con siete instalaciones atendidas a la semana por el personal de la estatal operativo y administrativo de las gerencias que se encuentran en la entidad.<\/p>\n\n\n\n<p>Con estas inspecciones se busca realizar un diagn\u00f3stico de toda la infraestructura el\u00e9ctrica, equipos de potencia, conductores, sistema de refrigeraci\u00f3n, puesta a tierra, estructuras y soportes, control y monitoreo, seguridad y se\u00f1alizaci\u00f3n, mantenimiento preventivo y las condiciones ambientales, en aras de atenci\u00f3n inmediata a las situaciones de las instalaciones.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Anzo\u00e1tegui.- 57 subestaciones el\u00e9ctricas de las \u00e1reas de transmisi\u00f3n, distribuci\u00f3n y generaci\u00f3n en el estado Anzo\u00e1tegui ser\u00e1n inspeccionadas durante<\/p>\n","protected":false},"author":24,"featured_media":94001,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30,7],"tags":[2706,2691,11,2744,46],"class_list":["post-94000","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","category-sen","tag-anzoategui","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94000","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=94000"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94000\/revisions"}],"predecessor-version":[{"id":94002,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94000\/revisions\/94002"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/94001"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=94000"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=94000"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=94000"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}