{"id":94155,"date":"2025-01-29T14:48:58","date_gmt":"2025-01-29T14:48:58","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=94155"},"modified":"2025-01-29T14:49:00","modified_gmt":"2025-01-29T14:49:00","slug":"corpoelec-efectua-mantenimiento-en-lineas-electricas-de-macagua","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=94155","title":{"rendered":"Corpoelec efect\u00faa mantenimiento en l\u00edneas el\u00e9ctricas de Macagua"},"content":{"rendered":"\n<p><strong>Estado Bol\u00edvar.- <\/strong>Con el firme prop\u00f3sito de garantizar la seguridad y el buen funcionamiento de las infraestructuras el\u00e9ctricas, la clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), llev\u00f3 a cabo una jornada de desmalezamiento en diversas \u00e1reas del patio 115 kV y 400 kV, ubicadas en la Central Hidroel\u00e9ctrica Antonio Jos\u00e9 de Sucre (Macagua).<\/p>\n\n\n\n<p>Estas maniobras forman parte de un conjunto de medidas orientadas a garantizar el \u00f3ptimo funcionamiento de las redes el\u00e9ctricas, a fin de seguir brindando a los usuarios del servicio, confiabilidad y calidad en el suministro de energ\u00eda.<\/p>\n\n\n\n<p>Este mantenimiento, adem\u00e1s de mantener estable la interconexi\u00f3n entre las plantas de generaci\u00f3n Caruachi y Macagua, tambi\u00e9n asegura la operatividad de los equipos para el abastecimiento de energ\u00eda hacia el sur del estado Bol\u00edvar.<\/p>\n\n\n\n<p>Estas acciones preventivas forman parte de las iniciativas dentro del plan estrat\u00e9gico de Corpoelec, para garantizar la fiabilidad del servicio el\u00e9ctrico, reduciendo los riesgos que representen el crecimiento descontrolado de la vegetaci\u00f3n cerca de las l\u00edneas de transmisi\u00f3n y distribuci\u00f3n.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Bol\u00edvar.- Con el firme prop\u00f3sito de garantizar la seguridad y el buen funcionamiento de las infraestructuras el\u00e9ctricas, la clase<\/p>\n","protected":false},"author":24,"featured_media":94156,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30],"tags":[2723,2691,11,2744,46],"class_list":["post-94155","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","tag-bolivar","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94155","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=94155"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94155\/revisions"}],"predecessor-version":[{"id":94157,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94155\/revisions\/94157"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/94156"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=94155"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=94155"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=94155"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}