{"id":94293,"date":"2025-02-01T19:19:47","date_gmt":"2025-02-01T19:19:47","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=94293"},"modified":"2025-02-01T19:19:48","modified_gmt":"2025-02-01T19:19:48","slug":"mantenimiento-en-redes-de-media-tension-beneficia-a-usuarios-carabobenos","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=94293","title":{"rendered":"Mantenimiento en redes de media tensi\u00f3n beneficia a usuarios carabobe\u00f1os"},"content":{"rendered":"\n<p><strong>Estado Carabobo.- <\/strong>La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) ejecut\u00f3 labores de mantenimiento preventivo en redes el\u00e9ctricas a fin de optimizar el servicio el\u00e9ctrico en comunidades carabobe\u00f1as.<\/p>\n\n\n\n<p>Con estas labores se benefici\u00f3 a m\u00e1s de 29.500 usuarios de los sectores del Conjunto Residencial Poblado de San Diego, Los Anauco, Yuma 26, Universidad Jos\u00e9 Antonio P\u00e1ez, Residencias Bella Vista, Los Sauces, Residencias Centro Tarbes, urbanizaci\u00f3n Quintas de Naguanagua, urbanizaci\u00f3n Canta Piedra, CC. Cristal, urbanizaci\u00f3n La Granja, Hotel Guaparo Inn, Escuela B\u00e1sica Manuel Malpica, entre otros.<\/p>\n\n\n\n<p>Entre las labores se realizaron la sustituci\u00f3n de conductor de 15 kV en los circuitos Granja y Carabobo; colocaci\u00f3n de poste en media tensi\u00f3n en el circuito Av. Bol\u00edvar de la subestaci\u00f3n Camoruco y 300 metros de poda de \u00e1rboles en media tensi\u00f3n en redes del circuito Morro I de la subestaci\u00f3n Montemayor.<\/p>\n\n\n\n<p>El Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE) y Corpoelec avanzan para garantizar el bienestar y la tranquilidad a los ciudadanos carabobe\u00f1os con el fortalecimiento del Servicio El\u00e9ctrico Nacional<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Carabobo.- La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) ejecut\u00f3 labores de mantenimiento preventivo en redes el\u00e9ctricas a<\/p>\n","protected":false},"author":24,"featured_media":94294,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30],"tags":[2692,2691,11,2744,46],"class_list":["post-94293","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","tag-carabobo","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94293","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=94293"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94293\/revisions"}],"predecessor-version":[{"id":94295,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94293\/revisions\/94295"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/94294"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=94293"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=94293"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=94293"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}