{"id":94343,"date":"2025-02-04T14:54:49","date_gmt":"2025-02-04T14:54:49","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=94343"},"modified":"2025-02-04T14:54:51","modified_gmt":"2025-02-04T14:54:51","slug":"inician-despeje-de-vegetacion-en-la-linea-115-kv-barinas-i-barinas-iii","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=94343","title":{"rendered":"Inician despeje de vegetaci\u00f3n en la l\u00ednea 115 KV Barinas I &#8211; Barinas III"},"content":{"rendered":"\n<p><strong>Estado Barinas.-<\/strong>\u00a0La Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) inici\u00f3 la adecuaci\u00f3n y despeje de la l\u00ednea 115 kV Barinas I &#8211; Barinas III, para garantizar la transmisi\u00f3n de energ\u00eda a m\u00e1s de 400 mil habitantes de las parroquias Coraz\u00f3n de Jes\u00fas, Ram\u00f3n Ignacio M\u00e9ndez y Obispos en la entidad llanera.<\/p>\n\n\n\n<p>El despliegue contemplado en el Plan de Mantenimiento de Corredores de Servicios, prev\u00e9 la atenci\u00f3n de 45 kil\u00f3metros de las infraestructuras, abarcando un total de 64 torres de alta tensi\u00f3n.<\/p>\n\n\n\n<p>Estas operaciones son necesarias para facilitar la atenci\u00f3n de eventos y la protecci\u00f3n de la red de transmisi\u00f3n.&nbsp;<\/p>\n\n\n\n<p>Martha Morales, habitante de la parroquia Ram\u00f3n Ignacio M\u00e9ndez, agradeci\u00f3 las acciones que se efectuaron.<\/p>\n\n\n\n<p>\u201cVer que est\u00e1n trabajando para despejar las v\u00edas y mantener las l\u00edneas de alta tensi\u00f3n nos da alegr\u00eda, pues esperamos que esto se traduzca en un servicio el\u00e9ctrico m\u00e1s confiable\u00bb, agreg\u00f3.<\/p>\n\n\n\n<p>El compromiso de la clase trabajadora del sector el\u00e9ctrico se refleja en acciones orientadas a garantizar condiciones \u00f3ptimas que promuevan el bienestar de los barineses, a trav\u00e9s de la ejecuci\u00f3n de obras que mejoran la calidad del servicio.<\/p>\n\n\n\n<p>Prensa MPPEE-Corpoelec<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Barinas.-\u00a0La Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) inici\u00f3 la adecuaci\u00f3n y despeje de la l\u00ednea 115 kV Barinas I &#8211; Barinas<\/p>\n","protected":false},"author":24,"featured_media":94344,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30],"tags":[2698,2691,11,2744,46],"class_list":["post-94343","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","tag-barinas","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94343","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=94343"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94343\/revisions"}],"predecessor-version":[{"id":94345,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94343\/revisions\/94345"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/94344"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=94343"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=94343"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=94343"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}