{"id":94374,"date":"2025-02-05T19:52:53","date_gmt":"2025-02-05T19:52:53","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=94374"},"modified":"2025-02-05T19:52:55","modified_gmt":"2025-02-05T19:52:55","slug":"corpoelec-fortalece-mantenimiento-preventivo-en-circuitos-de-barinas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=94374","title":{"rendered":"Corpoelec fortalece mantenimiento preventivo en circuitos de Barinas"},"content":{"rendered":"\n<p><strong>Estado Barinas.-<\/strong> La Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), efectu\u00f3 labores de mantenimiento preventivo en 25 circuitos del estado Barinas.<\/p>\n\n\n\n<p>Asimismo, realizaron poda de \u00e1rboles y limpieza de corredores de servicios, el personal de la Gerencia de Programaci\u00f3n y Control de Vegetaci\u00f3n adecu\u00f3 2.100 metros de redes de distribuci\u00f3n.<\/p>\n\n\n\n<p>Estas maniobras ejecutadas por el personal de Programaci\u00f3n y Control de Vegetaci\u00f3n, garantizan el suministro de energ\u00eda en los municipios Barinas, Bol\u00edvar, Antonio Jos\u00e9 de Sucre, Alberto Arvelo Torrealba, Ezequiel Zamora, Obispos, Rojas y Sosa.<\/p>\n\n\n\n<p>Las labores se efectuaron conjuntamente con el Poder Popular a trav\u00e9s del 1&#215;10 del Buen Gobierno.<\/p>\n\n\n\n<p>Corpoelec ratifica su compromiso de avanzar en la estabilizaci\u00f3n del Sistema El\u00e9ctrico Nacional (SEN) en el pa\u00eds.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Barinas.- La Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), efectu\u00f3 labores de mantenimiento preventivo en 25 circuitos del estado Barinas. Asimismo, realizaron<\/p>\n","protected":false},"author":24,"featured_media":94375,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30],"tags":[2698,2691,11,2744,46],"class_list":["post-94374","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","tag-barinas","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94374","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=94374"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94374\/revisions"}],"predecessor-version":[{"id":94376,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94374\/revisions\/94376"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/94375"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=94374"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=94374"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=94374"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}