{"id":94506,"date":"2025-02-10T18:12:41","date_gmt":"2025-02-10T18:12:41","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=94506"},"modified":"2025-02-10T18:12:43","modified_gmt":"2025-02-10T18:12:43","slug":"corpoelec-ejecuto-proyectos-de-electrificacion-en-sectores-falconianos","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=94506","title":{"rendered":"Corpoelec ejecut\u00f3 proyectos de electrificaci\u00f3n en sectores falconianos"},"content":{"rendered":"\n<p><strong>Estado Falc\u00f3n.- <\/strong>Como parte de las acciones que adelanta la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), se llev\u00f3 a cabo la electrificaci\u00f3n en los sectores La Rotaria, Campo Alegre, Jos\u00e9 Gregorio Hern\u00e1ndez, Los Pr\u00f3ceres, Barrio Lara y La Retama de la Comuna Agropecuaria M\u00e9danos de Coro de la parroquia San Gabriel, municipio Miranda.<\/p>\n\n\n\n<p>Las maniobras estuvieron a cargo de la Gerencia de Distribuci\u00f3n, quienes instalaron 2.200 metros arvidal, adem\u00e1s de 14 postes de baja, mediana y alta tensi\u00f3n, lo que favorece de manera directa a m\u00e1s de 600 familias.<\/p>\n\n\n\n<p>De igual manera, se instal\u00f3 un transformador el\u00e9ctrico de 50 kVA con su respectiva acometida, herrajes y conectores en el sector Campo Alegre, adem\u00e1s de la sustituci\u00f3n a 15 luminarias con tecnolog\u00eda led de 150 W, lo que mejora el sistema de alumbrado p\u00fablico en la zona.<\/p>\n\n\n\n<p>Nellys Donquiz, habitante del urbanismo Jos\u00e9 Gregorio Hern\u00e1ndez, manifest\u00f3 su agradecimiento al equipo de Corpoelec por ofrecer respuesta inmediata a los requerimientos solicitados a trav\u00e9s de la Consulta Popular Nacional.<\/p>\n\n\n\n<p>El Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE) a trav\u00e9s de Corpoelec y su clase trabajadora, cumple con su compromiso al pueblo venezolano en aras de mejorar, optimizar y fortalecer el sistema el\u00e9ctrico en Falc\u00f3n.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Falc\u00f3n.- Como parte de las acciones que adelanta la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), se llev\u00f3 a cabo la electrificaci\u00f3n<\/p>\n","protected":false},"author":24,"featured_media":94507,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30],"tags":[2691,2695,11,2744,46],"class_list":["post-94506","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","tag-corpoelec","tag-falcon","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94506","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=94506"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94506\/revisions"}],"predecessor-version":[{"id":94508,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94506\/revisions\/94508"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/94507"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=94506"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=94506"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=94506"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}