{"id":94538,"date":"2025-02-11T16:07:11","date_gmt":"2025-02-11T16:07:11","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=94538"},"modified":"2025-02-11T16:07:13","modified_gmt":"2025-02-11T16:07:13","slug":"familias-zulianas-se-benefician-con-instalacion-de-transformadores","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=94538","title":{"rendered":"Familias zulianas se benefician con instalaci\u00f3n de transformadores"},"content":{"rendered":"\n<p><strong>Municipio Maracaibo, estado Zulia.-<\/strong>\u00a0Como parte de las respuestas\u00a0a las solicitudes registradas por el Poder Popular en la plataforma del VenApp, personal de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) instal\u00f3 tres transformadores en el sector Dr. Pedro Iturbe del municipio Maracaibo en Zulia.<\/p>\n\n\n\n<p>La instalaci\u00f3n de estos equipos benefici\u00f3 a 36 familias, seg\u00fan inform\u00f3 la representante del Consejo Comunal Dr. Pedro Iturbe,&nbsp;Elvia Rosa Fern\u00e1ndez, &nbsp;quien expres\u00f3 su agradecimiento al Gobierno Nacional, liderado por el Presidente Nicol\u00e1s Maduro, por la atenci\u00f3n inmediata y oportuna a este requerimiento de la VenApp.<\/p>\n\n\n\n<p>Los equipos instalados constan de 25 kVA y 50kVA, respectivamente, brindando garant\u00eda y continuidad del servicio el\u00e9ctrico a los residentes de este sector que se encuentra cerca de la circunvalacion n\u00famero 1 en Maracaibo.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Municipio Maracaibo, estado Zulia.-\u00a0Como parte de las respuestas\u00a0a las solicitudes registradas por el Poder Popular en la plataforma del VenApp,<\/p>\n","protected":false},"author":24,"featured_media":94539,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30],"tags":[2691,11,2744,46,2694],"class_list":["post-94538","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela","tag-zulia"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94538","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=94538"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94538\/revisions"}],"predecessor-version":[{"id":94540,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94538\/revisions\/94540"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/94539"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=94538"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=94538"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=94538"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}