{"id":94553,"date":"2025-02-11T20:11:28","date_gmt":"2025-02-11T20:11:28","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=94553"},"modified":"2025-02-11T20:11:30","modified_gmt":"2025-02-11T20:11:30","slug":"corpoelec-instala-seis-transformadores-en-comunidades-tachirenses","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=94553","title":{"rendered":"Corpoelec instala seis transformadores en comunidades tachirenses"},"content":{"rendered":"\n<p><strong>Estado T\u00e1chira.- <\/strong>Con la instalaci\u00f3n de seis trasformadores, la clase obrera trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), fortalece el suministro de electricidad a m\u00e1s de 300 familias tachirenses.<br><br>Los trabajos fueron ejecutados por las cuadrillas del Distrito San Antonio en el eje fronterizo y permiti\u00f3 instalar cuatro trasformadores de 25 y 37.5 kVA, que benefici\u00f3 a los habitantes de los sectores Las Casitas, Cristal del Bosque, urbanizaci\u00f3n Integraci\u00f3n, barrio San Isidro y las zonas de comercio en el municipio Bol\u00edvar.<br><br>Asimismo, el personal t\u00e9cnico de la Gerencia de Distribuci\u00f3n, atendi\u00f3 la poblaci\u00f3n de Santa Ana en el municipio C\u00f3rdoba y la Urbanizaci\u00f3n Pirineos 1 en la zona metropolitana, con la sustituci\u00f3n de dos equipos el\u00e9ctricos de 25 y 50 kVA, dando respuesta a la solicitud que los usuarios realizan a trav\u00e9s del Sistema 1&#215;10 del Buen Gobierno.<br><br>El Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE) y Corpoelec ratifican su compromiso con el bienestar de los habitantes, en pro de optimizar el servicio el\u00e9ctrico ofrecido a\u00a0la poblaci\u00f3n en la entidad andina.<\/p>\n\n\n\n<p><strong>Prensa\u00a0MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado T\u00e1chira.- Con la instalaci\u00f3n de seis trasformadores, la clase obrera trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), fortalece el<\/p>\n","protected":false},"author":24,"featured_media":94554,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30],"tags":[2691,11,2744,2700,46],"class_list":["post-94553","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","tag-corpoelec","tag-mppee","tag-sen","tag-tachira","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94553","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=94553"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94553\/revisions"}],"predecessor-version":[{"id":94555,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94553\/revisions\/94555"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/94554"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=94553"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=94553"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=94553"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}